×

COMFORT-DRIVEN OPTIMIZATION OF ELECTRIC GRID UTILIZATION

  • US 20150094968A1
  • Filed: 12/08/2014
  • Published: 04/02/2015
  • Est. Priority Date: 02/26/2009
  • Status: Active Grant
First Claim
Patent Images

1. A system for electric grid utilization and optimization, comprising:

  • a communications interface comprising program code stored in a memory and executing on a network-connected server computer and adapted to receive information from a plurality of iNodes, the plurality of iNodes comprising a source iNode, a sink iNode, and a plurality of transmission or distribution iNodes;

    an event database computer coupled to the communications interface comprising program code stored in a memory and adapted to receive events from a plurality of iNodes via the communications interface;

    a modeling server computer coupled to the communications interface and comprising program code stored in a memory and adapted to receive a request to establish an allocation of at least one of transmission losses, distribution losses, and ancillary services to a specific sink iNode and compute at least one virtual path for flow of electricity between a source iNode and the specific sink iNode, and further wherein the modeling server further computes, for each transmission or distribution iNode included in the computed virtual path, at least one energy loss and allocates a portion thereof to the specific sink iNode; and

    a statistics server computer coupled to the event database and the modeling server, comprising program code stored in a memory and adapted to calculate a plurality of statistic from received information from connected iNodes.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×