×

System and Method for Integrated Risk and Health Management of Electric Submersible Pumping Systems

  • US 20150095100A1
  • Filed: 09/30/2013
  • Published: 04/02/2015
  • Est. Priority Date: 09/30/2013
  • Status: Abandoned Application
First Claim
Patent Images

1. A process for producing a risk analysis report for a plurality of pumping systems, the process comprising the steps of:

  • providing a local control unit at each of the plurality of pumping systems;

    providing output signals to each of the plurality of local control units from each of the corresponding pumping systems, wherein each of the output signals is reflective of an operating condition measured at the pumping system;

    processing the output signals at each of the plurality of local control units;

    producing a health index at each of the plurality of local control units; and

    uploading the health index from each of the plurality of local control units to a central data center.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×