PERFORMANCE MANAGEMENT SYSTEM, METHOD AND NON-TRANSITORY COMPUTER READABLE STORAGE MEDIUM THEREOF
First Claim
1. A performance management system, comprising:
- a value-driven management module, comprising;
a value-driven model configuration unit configured to configure a value-driven model with a plurality of targets, and the targets responding to a plurality of factors; and
a value-driven target configuration unit configured to set a goal value for each of the targets; and
an integrated control module configured to monitor operation performance of at least one building in accordance with the goal value for each of the targets and the value-driven model.
1 Assignment
0 Petitions
Accused Products
Abstract
A performance management system, method and a non-transitory computer readable storage medium are disclosed herein. The performance management system includes a value-driven management module and an integrated control module. The value-driven management module includes a value-driven model configuration unit and a value-driven target configuration unit. The value-driven model configuration unit is configured to configure a value-driven model with a plurality of targets, and the targets respond to a plurality of factors. The value-driven target configuration unit is configured to set a goal value for each of the targets. The integrated control module is configured to monitor a performance of a building in accordance with the goal value for each of the targets and the value-driven model.
14 Citations
19 Claims
-
1. A performance management system, comprising:
-
a value-driven management module, comprising; a value-driven model configuration unit configured to configure a value-driven model with a plurality of targets, and the targets responding to a plurality of factors; and a value-driven target configuration unit configured to set a goal value for each of the targets; and an integrated control module configured to monitor operation performance of at least one building in accordance with the goal value for each of the targets and the value-driven model. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A performance management method for managing at least one smart building with at least one electromechanical equipment, the performance management method comprising:
-
configuring a value-driven module, wherein the value-driven module comprises a plurality of targets responding to a plurality of factors; configuring a goal value for each of the targets; and monitoring the at least one electromechanical equipment in accordance with the value-driven module and the goal value for each of the targets. - View Dependent Claims (9, 10, 11, 12, 13)
-
-
14. A non-transitory computer readable storage medium for executing a performance management method, the performance management method comprising:
-
receiving a plurality of targets and factors from an input interface; establishing a value-driven model in accordance with the targets and the factors; configuring a goal value for each of targets by the input interface; and monitoring the operation performance of at least one smart building in accordance with the value-driven model and the goal value for each of the targets. - View Dependent Claims (15, 16, 17, 18, 19)
-
Specification