×

METHOD AND SYSTEM OF MANAGING REPLACEMENT TIMING INTERVAL OF MAINTENANCE PART

  • US 20150220875A1
  • Filed: 06/13/2012
  • Published: 08/06/2015
  • Est. Priority Date: 06/13/2012
  • Status: Abandoned Application
First Claim
Patent Images

1. A method of managing a replacement timing interval of a maintenance part that forecasts, by a management system using a calculator, a demand for a maintenance part of a machine having the maintenance part, which is periodically replaced due to time-dependent deterioration as a component, comprising the steps of:

  • a machine working-time information collection step of collecting working time of each of a plurality of machines worked in target areas where machine working conditions are similar to each other, and of memorizing the working time in a machine working-time information memory unit;

    a maintenance-part supply history information collection step of collecting an accumulated total number of actual maintenance-part supply of the maintenance part to the target area, and of memorizing the accumulated total number in a maintenance-part supply history information memory unit;

    a demand forecast simulation step of calculating past part replacement timing of each machine in the target area from a maintenance-part replacement timing interval for which a tentative value is previously determined and from the working time memorized in the machine working-time information memory unit, and of counting and outputting an accumulated total number of past maintenance-part replacement demand of all the machines in time series;

    a maintenance-part demand-supply gap calculation step of calculating and outputting a maintenance-part demand-supply gap value which is a difference between the time-series accumulated total number of maintenance-part replacement demand output in the demand forecast simulation step and the accumulated total number of the maintenance-part supply memorized in the maintenance-part supply history information memory unit; and

    a maintenance-part replacement timing interval update step of calculating and outputting an optimum estimation value of the maintenance-part replacement timing interval which minimizes the maintenance-part demand-supply gap value output in the maintenance-part demand-supply gap calculation step while changing the tentative value of the maintenance-part replacement timing interval,wherein a future demand for the maintenance part is forecasted by using the optimum estimation value of the maintenance-part replacement timing interval output in the maintenance-part replacement timing interval update step.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×