×

METHOD FOR MANAGING BREAKDOWN OF CONSTRUCTION EQUIPMENT FOR PROVIDING CURRENT WORKABLE INFORMATION

  • US 20150221143A1
  • Filed: 01/23/2013
  • Published: 08/06/2015
  • Est. Priority Date: 01/30/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method of managing a breakdown of construction equipment, comprising:

  • requesting, by a diagnosis device of the construction equipment, state information from a plurality of vehicle control devices;

    confirming, by the diagnosis device, the state information received from the plurality of vehicle control devices;

    transmitting, by the diagnosis device, breakdown information to a peripheral communication terminal or a control server when the plurality of vehicle control devices has a problem according to the state information;

    receiving, by the diagnosis device, a breakdown part and a current workable range of the construction equipment from the communication terminal or the control server; and

    displaying the breakdown part and the current workable range of the construction equipment on a gauge panel.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×