×

PRODUCTION SEQUENCE OPTIMIZING METHOD AND PRODUCTION SEQUENCE OPTIMIZING SYSTEM

  • US 20150248314A1
  • Filed: 09/12/2012
  • Published: 09/03/2015
  • Est. Priority Date: 09/12/2012
  • Status: Active Grant
First Claim
Patent Images

1. A production sequence optimizing method that classifies a plurality of production programs which are continuously executed using a production line into a plurality of groups which share resources used for production and that optimizes an execution order of the plurality of production programs, comprising:

  • a resource number counting step of counting the a number of all resources held in stock; and

    a resource allocation step of allocating the resources to each of the groups on the basis of the number of all resources, a number of resources required for an N-th group, and a number of resources required for an (N+1)-th group, where N is a natural number.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×