METHODS FOR PRODUCING FLUID INVASION RESISTANT CEMENT SLURRIES
First Claim
Patent Images
1. A method comprising:
- providing a wellbore in a subterranean formation having a wellbore length;
providing a proposed cement slurry formulation;
calculating a normalized pressure at a point along the wellbore length based on properties of the proposed cement slurry formulation and properties of the wellbore in the subterranean formation;
manipulating the proposed cement slurry formulation based on the normalized pressure so as to produce a fluid invasion resistant cement slurry;
introducing the fluid invasion resistant cement slurry into the wellbore; and
cementing the fluid invasion resistant cement slurry in the wellbore.
4 Assignments
0 Petitions
Accused Products
Abstract
Embodiments including methods comprising providing a wellbore in a subterranean formation having a wellbore length; providing a proposed cement slurry formulation; calculating a normalized pressure at a point along the wellbore length based on properties of the proposed cement slurry formulation and properties of the wellbore in the subterranean formation; manipulating the proposed cement slurry formulation based on the normalized pressure so as to produce a fluid invasion resistant cement slurry; introducing the fluid invasion resistant cement slurry into the wellbore; and cementing the fluid invasion resistant cement slurry in the wellbore.
17 Citations
20 Claims
-
1. A method comprising:
-
providing a wellbore in a subterranean formation having a wellbore length; providing a proposed cement slurry formulation; calculating a normalized pressure at a point along the wellbore length based on properties of the proposed cement slurry formulation and properties of the wellbore in the subterranean formation; manipulating the proposed cement slurry formulation based on the normalized pressure so as to produce a fluid invasion resistant cement slurry; introducing the fluid invasion resistant cement slurry into the wellbore; and cementing the fluid invasion resistant cement slurry in the wellbore. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. A method comprising:
-
providing a wellbore in a subterranean formation having a wellbore length; providing a proposed cement slurry formulation; calculating a normalized pressure at a point along the wellbore length based on properties of the proposed cement slurry formulation and properties of the wellbore in the subterranean formation; manipulating the proposed cement slurry formulation based on the normalized pressure so as to produce a fluid invasion resistant cement slurry; wherein the properties of the proposed cement slurry formulation used to determine the normalized pressure are selected from the group consisting of;
mass balance;
momentum balance;
compressibility;
shrinkage;
shear rate;rheological properties; and
any combinations thereof;introducing the fluid invasion resistant cement slurry into the wellbore in the subterranean formation; and cementing the fluid invasion resistant cement slurry in the wellbore in the subterranean formation. - View Dependent Claims (12, 13, 14, 15, 16)
-
-
17. A method comprising:
-
providing a wellbore in a subterranean formation having a wellbore length; providing a proposed cement slurry formulation; calculating a normalized pressure at a point along the wellbore length based on properties of the proposed cement slurry formulation and properties of the wellbore in the subterranean formation; manipulating the proposed cement slurry formulation based on the normalized pressure so as to produce a fluid invasion resistant cement slurry; wherein the properties of the proposed cement slurry formulation used to determine the normalized pressure are selected from the group consisting of;
mass balance;
momentum balance;
compressibility;
shrinkage;
shear rate;
rheological properties; and
any combinations thereof;wherein the rheological properties are selected from the group consisting of;
shear stress;
relaxation time;
retardation time;
viscosity;
structural shear modulus;
structural viscosity;
steady shear flow;
steady-state viscosity;
consistency index;
power law index;
static yield stress;
dynamic yield stress;
steady-state viscosity of an unstructured state;
steady-state viscosity of a structured state;
equilibrium time; and
any combinations thereof;introducing the fluid invasion resistant cement slurry into the wellbore in the subterranean formation; and cementing the fluid invasion resistant cement slurry in the wellbore in the subterranean formation. - View Dependent Claims (18, 19, 20)
-
Specification