POWER SUPPLY MANAGEMENT

  • US 20150295406A1
  • Filed: 04/02/2015
  • Published: 10/15/2015
  • Est. Priority Date: 04/15/2014
  • Status: Abandoned Application
First Claim
Patent Images

1. A method of reducing peak power demand on a mains-grid power supply network, the method comprising the steps of:

  • a] providing a data-communication network by which a plurality of users being fed by the power supply network are communicable;

    b] connecting a controller of at least a high-power-demand electrical device of each user to the data-communication network; and

    c] dynamically allocating via the data-communication network a usage time slot for energisation of said high-power-demand device based on demand, whereby usage of said high-power-demand devices associated with the data-communication network is controlled thereby enabling a reduction in overall peak power demand.