×

METHOD OF SETTING BEARING PRELOAD

  • US 20160017914A1
  • Filed: 03/06/2013
  • Published: 01/21/2016
  • Est. Priority Date: 03/06/2013
  • Status: Abandoned Application
First Claim
Patent Images

1. A method of setting a desired axial preload FP in a bearing arrangement comprising an inner ring and an outer ring, whereby one of the bearing rings is axially displaceable relative to the other of the bearing rings, the method comprising steps of:

  • (a) mounting a reference shim, having a thickness t, between the axially displaceable bearing ring and a fixed abutment, and preloading the bearing arrangement by applying a predetermined axial force FA against the displaceable bearing ring, wherebyprior to preloading, there is an initial axial gap δ

    ref between the reference shim and the displaceable bearing ring, and at a reference clamping force Fc, ref, less than the predetermined axial force FA, the displaceable bearing ring makes contact with the reference shim;

    (b) measuring an actual preload Factual of the bearing arrangement;

    (c) constructing an analytical model that correlates bearing preload to applied axial force on the bearing arrangement, the model encompassing a plurality of shims that define different values of the initial axial gap δ

    1, δ

    2, δ

    3, . . . δ

    i between the shim in question and the displaceable bearing ring and corresponding values for the clamping force Fc1, Fc2, Fc3, . . . Fci at which the shim makes contact with the displaceable bearing ring;

    (d) using the analytical model to;

    determine the value of the initial axial gap δ

    ref and the corresponding reference clamping force FC, ref, by identifying the reference shim as the shim from the plurality of shims which generates the measured preload Factual at the predetermined axial force FA; and

    determine a target value of the initial axial gap δ

    target and a corresponding target clamping force Fc, target, by identifying a target shim as a shim from the plurality of shims that generates the desired preload FP at the predetermined axial force FA; and

    (e) replacing the reference shim of thickness t with a second shim having a thickness of t+(δ

    ref

    δ

    target), such that the desired preload FP is achieved when the predetermined axial force FA is applied to the bearing arrangement.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×