COMPONENT MOUNTING METHOD AND COMPONENT MOUNTING SYSTEM
First Claim
Patent Images
1. A component mounting method in a component mounting apparatus that mounts a component onto a board using a plurality of pieces of production data linked to component data, the method comprising:
- executing, when the component data is changed, a simulation of a production cycle time based on the production data; and
making an improvement plan for the production cycle time as a target based on a simulation result after change of the component data, and outputting the improvement plan.
1 Assignment
0 Petitions
Accused Products
Abstract
A component mounting method is provided in a component mounting apparatus that mounts a component onto a board using a plurality of pieces of production data linked to component data. The method includes executing, when the component data is changed, a simulation of a production cycle time based on the production data, and making an improvement plan for the production cycle time as a target based on a simulation result after change of the component data, and outputting the improvement plan.
-
Citations
4 Claims
-
1. A component mounting method in a component mounting apparatus that mounts a component onto a board using a plurality of pieces of production data linked to component data, the method comprising:
-
executing, when the component data is changed, a simulation of a production cycle time based on the production data; and making an improvement plan for the production cycle time as a target based on a simulation result after change of the component data, and outputting the improvement plan. - View Dependent Claims (2)
-
-
3. A component mounting system that mounts a component onto a board using a plurality of pieces of production data linked to component data, the system comprising:
-
a component mounting line that includes a component mounting apparatus that executes an operation of mounting the component onto the board; a simulation executing section that executes, when the component data is changed, a simulation of a production cycle time based on the production data; and an improvement plan outputting section that makes an improvement plan for the production cycle time as a target based on a simulation result after change of the component data, and outputs the improvement plan. - View Dependent Claims (4)
-
Specification