SYSTEM AND METHOD FOR MANAGING UTILIZATION OF UN-LICENSED FREQUENCY SPECTRUM RESOURCES FOR SECONDARY SYSTEMS, AND A NON-TRANSITORY COMPUTER-READABLE MEDIUM
First Claim
1. A system for managing utilization of un-licensed frequency spectrum resources for secondary systems, comprisingcircuitry, configured toassign a first un-licensed frequency spectrum resource in an availability time period to a first secondary system;
- andreassign at least part of the first un-licensed frequency spectrum resource during the availability time period based on current resource utilization,wherein the circuitry is configured to assign and reassign the first un-licensed frequency spectrum resource under protection of a primary system which is licensed with the un-licensed frequency spectrum resources.
1 Assignment
0 Petitions
Accused Products
Abstract
A system and method for managing utilization of un-licensed frequency spectrum resources for secondary systems, a system and a method for the system, and a non-transitory computer-readable medium including computer-readable instructions. The system for managing utilization of un-licensed frequency spectrum resources for secondary systems includes: circuitry, configured to assign a first un-licensed frequency spectrum resource in an availability time period to a first secondary system and reassign at least part of the first un-licensed frequency spectrum resource during the availability time period based on current resource utilization, wherein the circuitry is configured to assign and reassign the first un-licensed frequency spectrum resource under protection of a primary system which is licensed with the un-licensed frequency spectrum resources.
20 Citations
20 Claims
-
1. A system for managing utilization of un-licensed frequency spectrum resources for secondary systems, comprising
circuitry, configured to assign a first un-licensed frequency spectrum resource in an availability time period to a first secondary system; - and
reassign at least part of the first un-licensed frequency spectrum resource during the availability time period based on current resource utilization, wherein the circuitry is configured to assign and reassign the first un-licensed frequency spectrum resource under protection of a primary system which is licensed with the un-licensed frequency spectrum resources. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16)
- and
-
17. A method for managing utilization of un-licensed frequency spectrum resources for secondary systems, comprising:
-
assigning a first un-licensed frequency spectrum resource in an availability time period to a first secondary system; and reassigning at least part of the first un-licensed frequency spectrum resource during the availability time period based on current resource utilization, wherein the steps of assigning and reassigning the first un-licensed frequency spectrum resource are under protection of a primary system which is licensed with the un-licensed frequency spectrum resources.
-
-
18. A system, comprising:
-
circuitry, configured to determine a first un-licensed frequency spectrum resource available to the system in an availability time period; receive a spectrum adjustment information during the availability time period that indicates at least part of the first un-licensed frequency spectrum resource no longer available to the system; and change operational parameters of the system based on the spectrum adjustment information, wherein the system operates on the first un-licensed frequency spectrum resource under protection of a primary system which is licensed with the un-licensed frequency spectrum resources.
-
-
19. A method for a system, comprising
determining a first un-licensed frequency spectrum resource available to the system in an availability time period; -
receiving a spectrum adjustment information during the availability time period that indicates at least part of the first un-licensed frequency spectrum resource no longer available to the system; and changing operational parameters of the system based on the spectrum adjustment information, wherein the system operates on the first un-licensed frequency spectrum resource under protection of a primary system which is licensed with the un-licensed frequency spectrum resources.
-
-
20. A non-transitory computer-readable medium including computer-readable instructions, which when executed by a system for managing utilization of un-licensed frequency spectrum resources for secondary systems, cause the system to:
-
assign a first un-licensed frequency spectrum resource in an availability time period to a first secondary system; and reassign at least part of the first un-licensed frequency spectrum resource during the availability time period based on current resource utilization, wherein the system assigns and reassigns the first un-licensed frequency spectrum resource under protection of a primary system which is licensed with the un-licensed frequency spectrum resources.
-
Specification