MULTI-INTERVAL DISPATCH METHOD FOR ENABLING DISPATCHERS IN POWER GRID CONTROL CENTERS TO MANAGE CHANGES BACKGROUND
First Claim
Patent Images
1. A method, comprising:
- applying, by a power grid device of a power grid comprising a processor that facilitates deployment of a comprehensive operating plan, an action defined by the comprehensive operating plan as a function of operating plan data, wherein the operating plan data represents the comprehensive operating plan to provide a multi-interval scheduling solution, based upon which operational resources of the power grid are allocated according to a schedule of the power grid to generate a supply of energy and dispatch the supply of energy by the power grid device; and
closing, by the power grid device, a first gap between a first schedule of day ahead scheduling that schedules a commitment of power grid resources for a day ahead of an identified day and a second schedule of a unit commitment plan, based upon which peak and valley demands of the power grid are managed.
2 Assignments
0 Petitions
Accused Products
Abstract
A method is provided that enables dispatchers in power grid control centers to manage changes by applying multi-interval dispatch. A multi-stage resource scheduling engine and a comprehensive operating plan are used. Multiple system parameter scenarios are coordinated.
8 Citations
20 Claims
-
1. A method, comprising:
-
applying, by a power grid device of a power grid comprising a processor that facilitates deployment of a comprehensive operating plan, an action defined by the comprehensive operating plan as a function of operating plan data, wherein the operating plan data represents the comprehensive operating plan to provide a multi-interval scheduling solution, based upon which operational resources of the power grid are allocated according to a schedule of the power grid to generate a supply of energy and dispatch the supply of energy by the power grid device; and closing, by the power grid device, a first gap between a first schedule of day ahead scheduling that schedules a commitment of power grid resources for a day ahead of an identified day and a second schedule of a unit commitment plan, based upon which peak and valley demands of the power grid are managed. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. A system, comprising:
-
a power grid device of a power grid comprising a processor and configured to facilitate execution of executable components, the executable components comprising; a management component that employs a management tool that facilitates a multi-level dispatch operation of power grid resources of the power grid; a response component that responds to a demand for renewable resources including energy; an application component that applies a multi-interval scheduling solution based upon which operational resources of the power grid are allocated, a supply of energy is generated, and the supply of energy is dispatched; and a first bridging component that closes a first gap between a first schedule of day ahead scheduling that schedules a commitment of power grid resources for a day ahead of an identified day and a second schedule of an economic dispatch sequence plan that schedules a dispatch of the power grid resources at different time periods. - View Dependent Claims (12, 13, 14, 15, 16, 17)
-
-
18. A power grid device of a power grid, comprising:
-
a memory storing executable components; and a processor, communicatively coupled to the memory, that executes or facilitates execution of the executable components, the executable components, comprising; a dispatch component configured to match a supply flow of energy from a renewable energy source to an energy demand of the power grid in accordance with an energy demand prediction model that forecasts the energy demand of the power grid during one or more scheduled time intervals; and a first closing component configured to close a first gap between a first schedule of a unit commitment plan based upon which a set of peak and valley demands of the power grid are managed and a second schedule of an economic dispatch plan based upon which power grid resources are dispatched at different time periods. - View Dependent Claims (19, 20)
-
Specification