×

SUPPLY CHAIN MESSAGE MANAGEMENT AND SHIPMENT CONSTRAINT OPTIMIZATION

  • US 20160162838A1
  • Filed: 12/28/2015
  • Published: 06/09/2016
  • Est. Priority Date: 03/15/2013
  • Status: Active Grant
First Claim
Patent Images

1. A method for improved efficiency of translation of a business message through a message translation system in a supply chain system, the method comprising:

  • (a) receiving, by a computing system of the message translation system, a business message including respective constraints on a plurality of resources, wherein the plurality of constraints includes a plurality of temporal constraints and a plurality of qualitative constraints;

    (b) processing the plurality of constraints, by a processor of a message translation system, into a format for use with the computing system;

    (c) expanding a first qualitative constraint of the plurality of qualitative constraints into an expanded temporal constraint on a first resource of the plurality of resources meeting one or more quality levels associated with the plurality of qualitative constraints;

    (d) translating, by the computing system, the plurality of temporal constraints and the expanded temporal constraint into respective sets of binary temporal constraints;

    (f) combining, by the computing system, each of the respective sets of the binary temporal constraints into combined respective binary temporal constraints, wherein combining the respective sets of binary temporal constraints into combined respective binary temporal constraints includes applying one or more bit-wise Boolean operations to the respective sets of binary temporal constraints;

    (g) combining, by the computing system, the combined respective binary temporal constraints into a single overall binary temporal schedule, wherein combining the combined respective binary temporal constraints includes applying one or more bit-wise Boolean operations to the combined respective binary temporal constraints;

    (h) translating, by the computing system, the single overall binary temporal schedule into a non-binary temporal schedule; and

    (i) displaying to a user, one or more viable scheduling alternatives from the non-binary temporal schedule.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×