×

Re-tasking Balloons in a Balloon Network Based on Expected Failure Modes of Balloons

  • US 20160173324A1
  • Filed: 02/19/2016
  • Published: 06/16/2016
  • Est. Priority Date: 08/30/2013
  • Status: Abandoned Application
First Claim
Patent Images

1. A system comprising:

  • a balloon; and

    a control system configured to;

    determine at a first time that a first component of the balloon is predicted to fail;

    based on determining that the first component of the balloon is predicted to fail, assign the balloon to perform a first task within a network of balloons;

    determine at a later second time that a second component of the balloon is predicted to fail earlier than the first component of the balloon; and

    in response to determining that the second component of the balloon is predicted to fail earlier than the first component of the balloon, reassign the balloon from the first task to perform a second task within the network of balloons, wherein performance of the second task reduces usage of the second component of the balloon relative to performance of the first task.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×