Yielding of Hydrated Lime in Set-Delayed and Other Settable Compositions
First Claim
1. A method of controlling the rheology of a set-delayed cement composition, the method comprising:
- providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder;
shearing the set-delayed cement composition in an amount sufficient to substantially prevent solids settling;
storing the set-delayed cement in a pumpable fluid state for at least 1 day;
activating the set-delayed cement composition;
introducing the set-delayed cement composition into a subterranean formation; and
allowing the set-delayed cement composition to set in the subterranean formation.
1 Assignment
0 Petitions
Accused Products
Abstract
Methods and systems directed to controlling the rheology of settable compositions in subterranean formations. Embodiments include a method of controlling the rheology of a set-delayed cement composition, the method comprising: providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder; shearing the set-delayed cement composition in an amount sufficient to substantially prevent solids settling; storing the set-delayed cement in a pumpable fluid state for at least 1 day; activating the set-delayed cement composition; introducing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation. Additional methods and systems are also provided.
29 Citations
18 Claims
-
1. A method of controlling the rheology of a set-delayed cement composition, the method comprising:
-
providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder; shearing the set-delayed cement composition in an amount sufficient to substantially prevent solids settling; storing the set-delayed cement in a pumpable fluid state for at least 1 day; activating the set-delayed cement composition; introducing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. A method of controlling the rheology of a settable composition, the method comprising:
-
providing a settable composition comprising water, hydrated lime, and a material selected from the group consisting of a Portland cement, a pozzolanic cement, a gypsum cement, a soil cement, a calcium phosphate cement, a high-alumina content cement, a silica cement, a high-alkalinity cement, a slag cement, cement kiln dust, pumice, and mixtures thereof; shearing the settable composition in an amount sufficient to substantially prevent solids settling; introducing the settable composition into the subterranean formation; and allowing the settable composition to set in the subterranean formation. - View Dependent Claims (12, 13, 14, 15, 16)
-
-
17. A system for controlling the rheology of a set-delayed cement composition, the system comprising:
-
a set-delayed cement composition comprising; water; pumice; hydrated lime; and a set retarder; and mixing equipment for shearing the set-delayed cement composition in an amount sufficient to substantially prevent solids settling in the set-delayed cement composition. - View Dependent Claims (18)
-
Specification