1. A monitoring and controlling system for megawatt level battery energy storage power plant comprising:

  • a central monitoring and controlling module configured to determine the power command value of each energy storage substation of the battery energy storage power plant, and send it to all local monitoring and controlling modules; and

    local monitoring and controlling modules configured to calculate the power command value of each energy storage unit of the energy storage substations, send it to each energy storage unit, and upload to a central monitoring and controlling module to store,wherein the data transmission and communication are carried out through communication networks, said communication networks including real time and non-real time communication parallel network structure between said central monitoring and controlling module and said local monitoring and controlling modules.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×