×

PLANNING AND PERFORMING RE-FRACTURING OPERATIONS BASED ON MICROSEISMIC MONITORING

  • US 20160230524A1
  • Filed: 02/05/2015
  • Published: 08/11/2016
  • Est. Priority Date: 02/05/2015
  • Status: Active Grant
First Claim
Patent Images

1. A method of stimulating an earth formation, comprising:

  • disposing a stimulation device at a borehole in an earth formation, the earth formation having been stimulated by an initial stimulation operation;

    subsequent to the stimulation operation, performing a probe operation configured to cause movement of existing fractures in the formation;

    measuring microseismic events occurring in the formation by one or more seismic receivers;

    identifying one or more target zones in the formation based on the measuring, the one or more target zones exhibiting a reduced microseismicity relative to another zone in the formation; and

    designing a re-stimulation operation configured to stimulate the one or more target zones to increase hydrocarbon production from the formation.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×