FAILURE MODELING BY INCORPORATION OF TERRESTRIAL CONDITIONS
First Claim
1. A system to schedule inspection of a plurality of assets at a corresponding plurality of outdoor locations, the system comprising:
- an input interface configured to obtain a selection of the plurality of assets;
a processor configured to obtain terrestrial geotagged images that include one or more of the plurality of assets, obtain parameters associated with each of the plurality of assets based on information from the images, determine risk factors associated with each of the plurality of assets based on the associated parameters and a failure mapping, and determine a risk score for each of the plurality of assets based on the corresponding risk factors; and
an output interface configured to output an inspection schedule for the plurality of assets based on their corresponding risk score.
2 Assignments
0 Petitions
Accused Products
Abstract
A system and method to schedule inspections for a plurality of assets at a corresponding plurality of outdoor locations are described. The method includes retrieving location attributes of each of the plurality of assets, retrieving terrestrial geotagged images that include one or more of the plurality of assets, obtaining parameters associated with each of the plurality of assets based on information from the images, and determining risk factors associated with each of the plurality of assets based on the associated parameters and a failure mapping. The method also includes determining a risk score for each of the plurality of assets based on the corresponding risk factors, and scheduling inspections of the plurality of assets based on the risk score associated with each of the plurality of assets.
61 Citations
9 Claims
-
1. A system to schedule inspection of a plurality of assets at a corresponding plurality of outdoor locations, the system comprising:
-
an input interface configured to obtain a selection of the plurality of assets; a processor configured to obtain terrestrial geotagged images that include one or more of the plurality of assets, obtain parameters associated with each of the plurality of assets based on information from the images, determine risk factors associated with each of the plurality of assets based on the associated parameters and a failure mapping, and determine a risk score for each of the plurality of assets based on the corresponding risk factors; and an output interface configured to output an inspection schedule for the plurality of assets based on their corresponding risk score. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
Specification