Systems and Methods for Interrelated Control of Chlorinators and Pumps
First Claim
1. A system for controlling the chlorine output of a chlorinator and a circulation schedule of a pump, the system comprising:
- a pump operable to circulate a fluid according to a pump operation time setting;
a chlorinator operatively coupled to the pump and through which the fluid is circulated by the pump; and
a controller operatively coupled to the chlorinator and the pump, the controller accepting settings from a user for pump operation time setting and a chlorine output setting, the controller being programmed to automatically control the chlorinator and the pump based on a relationship between the chlorine output setting, a chlorine generation capacity of the chlorinator, and the pump operation time setting.
5 Assignments
0 Petitions
Accused Products
Abstract
Systems and methods for combined controlling chlorinators and pumps for pools and spas are provided. Exemplary embodiments can include a pump operable to circulate a fluid for a specified time period according to a pump operation time setting and a chlorinator operatively coupled to the pump. The chlorinator can be configured to generate chlorine based on a chlorine output setting, a chlorine generation capacity of the chlorinator, and the pump operation time. A controller can be operatively coupled to the chlorinator and the pump and can be programmed to control the chlorinator and the pump based on a relationship between the chlorine output setting, a chlorine generation capacity of the chlorinator, and the pump operation time.
-
Citations
27 Claims
-
1. A system for controlling the chlorine output of a chlorinator and a circulation schedule of a pump, the system comprising:
-
a pump operable to circulate a fluid according to a pump operation time setting; a chlorinator operatively coupled to the pump and through which the fluid is circulated by the pump; and a controller operatively coupled to the chlorinator and the pump, the controller accepting settings from a user for pump operation time setting and a chlorine output setting, the controller being programmed to automatically control the chlorinator and the pump based on a relationship between the chlorine output setting, a chlorine generation capacity of the chlorinator, and the pump operation time setting. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
-
12. A method of controlling a chlorine feed rate of a chlorinator and the operation time of a pump operatively coupled to the chlorinator, the method comprising:
-
receiving an input from a user via a control panel associated with a controller operatively coupled to a chlorinator and a pump, the chlorinator having a configurable chlorine output setting, the pump having a configurable pump operation time setting; and controlling the chlorinator feed rate and the pump based on a relationship between the chlorine output setting, a chlorine generation capacity of the chlorinator, and the pump operation time setting. - View Dependent Claims (13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24)
-
-
25. A method of determining a chlorine feed rate of a chlorinator and a schedule of operation for a pump operatively coupled to the chlorinator, the method comprising:
-
receiving an input from a user to adjust a chlorine output setting via a control panel associated with a controller operative coupled to a chlorinator and a pump, the chlorinator having a configurable chlorine feed rate setting, the pump having a configurable pump operation time setting; and determining at least one of the chlorinator feed rate setting or the pump operation time setting to be set to achieve the chlorine output setting; and indicating to the user that an adjustment of at least one of the chlorine feed rate or the pump operation time setting is required to achieve the chlorine output setting. - View Dependent Claims (26, 27)
-
Specification