×

BUILDING CONTROL SYSTEMS WITH OPTIMIZATION OF EQUIPMENT LIFE CYCLE ECONOMIC VALUE WHILE PARTICIPATING IN IBDR AND PBDR PROGRAMS

  • US 20160377306A1
  • Filed: 08/25/2016
  • Published: 12/29/2016
  • Est. Priority Date: 10/08/2015
  • Status: Active Grant
First Claim
Patent Images

1. A central plant configured to generate and provide resources to a building, the central plant comprising:

  • an electrical energy storage subplant configured to store electrical energy purchased from a utility and to discharge the stored electrical energy;

    a plurality of generator subplants configured to consume one or more input resources comprising the discharged electrical energy and to generate one or more output resources to satisfy a resource demand of the building; and

    a controller configured to determine, for each time step within a time horizon, an optimal allocation of the input resources and the output resources for each of the subplants in order to optimize a total monetary value of operating the central plant over the time horizon.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×