CDR CONTROL CIRCUIT, CDR CIRCUIT, AND CDR CONTROL METHOD
First Claim
1. A CDR control circuit that detects a phase shift of input data that is taken in with a phase-adjusted clock, and generates phase control data that controls the phase of the clock based on the detected phase shift, the CDR control circuit comprising:
- a change detection circuit that detects an over-change in the phase shift; and
a selection circuit that outputs the phase shift before the change, which is the phase shift before the time of detection of the over-change, as the phase shift for a predetermined period of time at the time of detection of the over-change, whereinduring the predetermined period of time, the phase control data is generated based on the phase shift before change.
1 Assignment
0 Petitions
Accused Products
Abstract
A CDR control circuit detects a phase shift of input data that is taken in with a phase-adjusted clock, and generates phase control data that controls the phase of the clock based on the detected phase shift, the CDR control circuit includes a change detection circuit that detects an over-change in the phase shift; and a selection circuit that outputs the phase shift before the change, which is the phase shift before the time of detection of the over-change, as the phase shift for a predetermined period of time at the time of detection of the over-change, wherein during the predetermined period of time, the phase control data is generated based on the phase shift before change.
-
Citations
10 Claims
-
1. A CDR control circuit that detects a phase shift of input data that is taken in with a phase-adjusted clock, and generates phase control data that controls the phase of the clock based on the detected phase shift, the CDR control circuit comprising:
-
a change detection circuit that detects an over-change in the phase shift; and a selection circuit that outputs the phase shift before the change, which is the phase shift before the time of detection of the over-change, as the phase shift for a predetermined period of time at the time of detection of the over-change, wherein during the predetermined period of time, the phase control data is generated based on the phase shift before change. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A CDR circuit comprising:
-
a phase adjustment circuit that adjusts a phase of a multiphase reference clock to a phase corresponding to phase control data and generates a multiphase-adjusted clock; a latch circuit that takes in input data with a multiphase-adjusted clock; a de-serializer that converts a latched signal into parallel data; and a CDR control circuit that detects a phase shift from the parallel data and generates the phase control data based on the detected phase shift, wherein, the CDR control circuit includes; a change detection circuit that detects an over-change in the phase shift; and a selection circuit that outputs a phase shift before change, which is the phase shift before the time of detection of the over-change, as the phase shift during a predetermined period of time at the time of detection of the over-change, during the predetermined period of time, the phase control data being generated based on the phase shift before change.
-
-
9. A CDR control method of detecting a phase shift of input data that is taken in with a phase-adjusted clock and generating phase control data that controls the phase of the clock based on the detected phase shift, the method comprising:
- after an initial lock is completed,
detecting the current phase shift; updating and holding a phase shift at a time a second time before the current time; calculating a difference between the phase shift at a time the first time before the current time and the current phase shift as an amount of change, and comparing the amount of change with a limit value of the phase shift per the first time; performing a CDR normal operation to generate the phase control data based on the current phase shift in a case where the amount of change does not exceed the limit value, suspending the CDR normal operation in a case where the amount of change exceeds the limit value, and generating the phase control data based on the phase shift at the time the second time before during a predetermined period of time; and resuming, after the predetermined period of time elapses, the CDR normal operation to generate the phase control data based on the current phase shift. - View Dependent Claims (10)
- after an initial lock is completed,
Specification