MEDIA MANAGEMENT SYSTEM
First Claim
1. A method of managing media regarding a construction project according to information regarding the construction project stored by one or more construction information management systems implemented via at least one first processor, the media comprising audio and/or visual content, the one or more construction information management systems storing information on planning and/or execution of the construction project, the construction project comprising at least one structure to be built, maintained, and/or renovated according to a plan for the construction project, the plan comprising a design of the at least one structure identifying components of the at least one structure, the method comprising:
- based on determining that a first element of the information regarding the construction project is to be used by a media management system implemented via at least one second processor to organize the media,configuring a first construction information management system, of the one or more construction information management systems, that stores information from which the first element was identified to request from the media management system media that is associated with the first element.
3 Assignments
0 Petitions
Accused Products
Abstract
Described herein are various techniques for managing media related to a construction project, which may relate to one or more buildings to be built and/or renovated as part of the construction project. In accordance with techniques described herein, the media may be managed according to information regarding the construction project that is stored by one or more other systems separate from a media management system. The other systems may be construction information management systems that each store information regarding a construction project, including information relating to planning and/or execution of the construction project. For example, the media management system may generate tags based on the information regarding the construction project, may be trained to recognize features in the media that relate to the tags, and add the appropriate tags to the media based on the recognized features.
19 Citations
21 Claims
-
1. A method of managing media regarding a construction project according to information regarding the construction project stored by one or more construction information management systems implemented via at least one first processor, the media comprising audio and/or visual content, the one or more construction information management systems storing information on planning and/or execution of the construction project, the construction project comprising at least one structure to be built, maintained, and/or renovated according to a plan for the construction project, the plan comprising a design of the at least one structure identifying components of the at least one structure, the method comprising:
based on determining that a first element of the information regarding the construction project is to be used by a media management system implemented via at least one second processor to organize the media, configuring a first construction information management system, of the one or more construction information management systems, that stores information from which the first element was identified to request from the media management system media that is associated with the first element. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
13. A media management system comprising:
-
at least one processor; and at least one storage medium having encoded thereon executable instructions that, when executed by the at least one processor, cause the at least one processor to carry out a method comprising; training a model to recognize a defect in an object using a plurality of media descriptive of the defect in the object, wherein training the model comprises extracting features corresponding to the defect from portions of the plurality of media descriptive of the defect, the portions of the plurality of media being associated with data indicating that the portions correspond to the defect; further training the model using scale training data to recognize at least one dimension of the defect, wherein the scale training data comprises at least some of the plurality of media, wherein the at least some of the plurality of media depicts at least one other object, and wherein training the model using the scale training data comprises determining a scale for the at least some of the plurality of media in the scale training data based on at least one known dimension of the at least one other object and determining a dimension of the defect in the object in the at least some of the plurality of media based on the scale; receiving media including content relating to a premises; processing the media using the model to identify the defect in the media including content relating to the premises using the model and to determine a dimension of the defect in the media; and adding at least one tag to the media responsive to identifying the defect in the media including content relating to the premises, the at least one tag being descriptive of a presence of the defect and the at least one dimension of the defect. - View Dependent Claims (14, 15, 16, 17, 18)
-
-
19. A media management system comprising:
-
at least one processor; and at least one storage medium having encoded thereon executable instructions that, when executed by the at least one processor, cause the at least one processor to carry out a method comprising; receiving training media descriptive of a worker missing at least one piece of safety equipment; receiving annotations in the training media indicative of a presence or an absence of the safety violation in the training media; training a model using the annotated training media to detect the safety violation; receiving the media including content relating to a construction project; identifying the safety violation in the media including content relating to the construction project using the model; and adding at least one tag to the media responsive to identifying the safety violating in the media including content relating to the construction project, the at least one tag being descriptive of a presence of the safety violation. - View Dependent Claims (20, 21)
-
Specification