×

CASCADE REFRIGERATION SYSTEM

  • US 20170167758A1
  • Filed: 12/15/2015
  • Published: 06/15/2017
  • Est. Priority Date: 12/15/2015
  • Status: Active Grant
First Claim
Patent Images

1. A cascade refrigeration system comprising:

  • a first cooling device including a first compressor, a condenser disposed downstream of said first compressor, a first expansion device disposed downstream of said condenser, an evaporator disposed downstream of said first expansion device, and a first conduit that fluidly interconnects said first compressor, said condenser, said first expansion device and said evaporator and that is configured to circulate a first refrigerant, said evaporator having a first passage connected to said first conduit, and a second passage independent from and not communicating with said first passage;

    a second cooling device including a second compressor, a first heat exchanger disposed downstream of said second compressor, and a second conduit fluidly interconnecting said first heat exchanger, said second passage and said second compressor; and

    a circulation switching device including a first switching mechanism connected to said first conduit downstream of said condenser and upstream of said first expansion device, a first circulation pipeline fluidly interconnecting said first switching mechanism, said first heat exchanger and said first compressor, and a first circulation expansion device connected to said first circulation pipeline downstream of said first switching mechanism and upstream of said first heat exchanger, said first switching mechanism being switchable between a first position, where the first refrigerant flows through said first switching mechanism, said first expansion device, said first passage and back into said first compressor along said first conduit, and a second position, where the first refrigerant flows through said first switching mechanism, said first circulation expansion device, said first heat exchanger and back into said first compressor along said first circulation pipeline.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×