×

GAS TURBINE WATER WASH METHODS AND SYSTEMS

  • US 20170191375A1
  • Filed: 12/31/2015
  • Published: 07/06/2017
  • Est. Priority Date: 12/31/2015
  • Status: Active Grant
First Claim
Patent Images

1. A control system for a gas turbine, comprising:

  • a controller comprising a processor, wherein the processor is configured to;

    receive a plurality of signals from sensors disposed in a turbine system, wherein the turbine system comprises a compressor system;

    derive a compressor efficiency and a turbine heat rate based on the plurality of signals;

    determine if an online water wash, an offline water wash, or a combination thereof, should be executed; and

    if it is determined that the online water wash, the offline water wash, or the combination thereof, should be executed, then executing the online water wash, the offline water wash, or the combination thereof.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×