SYSTEMS AND METHODS FOR MONITORING AND CONTROLLING A CENTRAL PLANT
First Claim
1. A system for monitoring and controlling a central plant having a plurality of subplants configured to serve thermal energy loads, the system comprising:
- a high level optimizer configured to determine recommended subplant loads for each of the plurality of subplants;
a user interface configured to receive manual subplant loads specified by a user;
a dispatch graphical user interface (GUI) generator configured to generate a dispatch GUI and present the dispatch GUI via the user interface, the dispatch GUI comprising the recommended subplant loads and the manual subplant loads;
a low level optimizer configured to determine recommended equipment setpoints for equipment of the central plant based on at least one of the recommended subplant loads and the manual subplant loads; and
a building automation system configured to provide control signals for the equipment of the central plant based on the recommended equipment setpoints.
3 Assignments
0 Petitions
Accused Products
Abstract
A system for monitoring and controlling a central plant includes a high level optimizer, a subplant monitor, a user interface, and a dispatch graphical user interface (GUI) generator. The central plant includes a plurality of subplants configured to serve a thermal energy load. The high level optimizer is configured to determine recommended subplant loads for each of the plurality of subplants. The subplant monitor is configured to monitor the central plant and identify actual subplant loads for each of the plurality of subplants. The user interface is configured to receive manual subplant loads specified by a user. The dispatch GUI generator is configured to generate a dispatch GUI and present the dispatch GUI via the user interface. The dispatch GUI includes the recommended subplant loads, the actual subplant loads, and the manual subplant loads.
49 Citations
20 Claims
-
1. A system for monitoring and controlling a central plant having a plurality of subplants configured to serve thermal energy loads, the system comprising:
-
a high level optimizer configured to determine recommended subplant loads for each of the plurality of subplants; a user interface configured to receive manual subplant loads specified by a user; a dispatch graphical user interface (GUI) generator configured to generate a dispatch GUI and present the dispatch GUI via the user interface, the dispatch GUI comprising the recommended subplant loads and the manual subplant loads; a low level optimizer configured to determine recommended equipment setpoints for equipment of the central plant based on at least one of the recommended subplant loads and the manual subplant loads; and a building automation system configured to provide control signals for the equipment of the central plant based on the recommended equipment setpoints. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A system for monitoring and controlling a central plant having a plurality of subplants configured to serve a thermal energy load, the system comprising:
-
a high level optimizer configured to determine recommended subplant loads for each of the plurality of subplants; a subplant monitor configured to monitor the central plant and identify actual subplant loads for each of the plurality of subplants; a user interface configured to receive manual subplant loads specified by a user; and a dispatch graphical user interface (GUI) generator configured to generate a dispatch GUI and present the dispatch GUI via the user interface, the dispatch GUI comprising the recommended subplant loads, the actual subplant loads, and the manual subplant loads. - View Dependent Claims (9, 10, 11, 12, 13, 14, 15, 16, 17)
-
-
18. A system for monitoring and controlling a central plant having a plurality of subplants configured to serve thermal energy loads, the system comprising:
-
a central plant optimizer configured to determine subplant load setpoints for each of the plurality of subplants and equipment setpoints to achieve the subplant load setpoints; a user interface; and a dispatch graphical user interface (GUI) generator configured to generate a dispatch GUI and present the dispatch GUI via the user interface, the dispatch GUI comprising at least one of the subplant load setpoints and the equipment setpoints for each of a plurality of dispatch intervals. - View Dependent Claims (19, 20)
-
Specification