SYSTEM AND METHOD FOR FACILITATING SUBTERRANEAN HYDROCARBON EXTRACTION UTILIZING ELECTROCHEMICAL REACTIONS WITH METALS
First Claim
Patent Images
1. A method to facilitate extraction of subterranean hydrocarbons from a geologic structure, the method comprising:
- injecting a first fluid composition comprising a base metal and proppant particles into a first wellbore that extends into the geologic structure, the base metal particles having a first density and the proppant particles having a second density, wherein a ratio of the second density to the first density is equal to or less than 5;
wherein corrosion of the base metal in the wellbore results in electrochemical oxidation of the base metal and electrochemical reduction of a reducible species that generates a gaseous product, thereby increasing the subterranean pressure in at least a portion of the wellbore; and
wherein the base metal corrodes in the wellbore at a rate sufficient to produce a gaseous product that induces fractures within the geologic structure, and at least some of the induced fractures are kept open by the proppant particles thereby facilitating egress of hydrocarbons from the geologic structure.
1 Assignment
0 Petitions
Accused Products
Abstract
Methods and systems for facilitating extraction of subterranean hydrocarbons from a geologic structure. The present methods include causing corrosion of a base metal within a geologic structure to produce a gaseous product to increase pressure and form fractures in the geologic structure. Some embodiments of the present methods include injecting a fluid composition comprising the base metal into a wellbore (e.g., into a geologic structure via the wellbore).
9 Citations
50 Claims
-
1. A method to facilitate extraction of subterranean hydrocarbons from a geologic structure, the method comprising:
-
injecting a first fluid composition comprising a base metal and proppant particles into a first wellbore that extends into the geologic structure, the base metal particles having a first density and the proppant particles having a second density, wherein a ratio of the second density to the first density is equal to or less than 5; wherein corrosion of the base metal in the wellbore results in electrochemical oxidation of the base metal and electrochemical reduction of a reducible species that generates a gaseous product, thereby increasing the subterranean pressure in at least a portion of the wellbore; and wherein the base metal corrodes in the wellbore at a rate sufficient to produce a gaseous product that induces fractures within the geologic structure, and at least some of the induced fractures are kept open by the proppant particles thereby facilitating egress of hydrocarbons from the geologic structure. - View Dependent Claims (2, 3, 4, 5, 23, 24, 25, 26, 27, 28, 29, 30, 31, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50)
-
-
6. A method to facilitate extraction of subterranean hydrocarbons from a geologic structure, the method comprising:
-
injecting a first fluid composition comprising a base metal into a first wellbore that extends into the geologic structure; wherein corrosion of the base metal in the wellbore results in electrochemical oxidation of the base metal and electrochemical reduction of a reducible species that generates a gaseous product and a metal oxide product; wherein the gaseous product increases the subterranean pressure, thereby inducing fractures within the geologic structure; and
,wherein induced fractures are kept open by the metal oxide product, thereby facilitating hydrocarbon egress from the geologic structure. - View Dependent Claims (7, 8, 9, 10)
-
-
11. A method to facilitate extraction of subterranean hydrocarbons from a geologic structure by sequentially injecting alternate stages of fracturing fluid compositions from a wellhead into a wellbore, the method comprising:
-
injecting a first fluid composition comprising base metal particles into the wellbore for a first predetermined time period; injecting a second fluid composition comprising an activating additive into the wellbore for a second predetermined time period; wherein the first fluid and second fluid are injected in sequence to produce an electrochemical reaction at a distance from the wellhead; wherein the activating additive activates a corrosion process resulting in electrochemical oxidation of the base metal and electrochemical reduction of a reducible species; and
,wherein the electrochemical reaction between the base metal and a reducible species that generates a gaseous product and a metal oxide product. - View Dependent Claims (12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 32, 33, 34, 35)
-
Specification