DOWN HOLE SURVEYING
First Claim
Patent Images
1. An apparatus for indexing a device about an indexing axis, the apparatus comprising:
- an indexing drive mechanism comprising a drive portion configured in driving engagement with a driven member for indexing the device about the indexing axis,the driven member arranged in operable association with an assembly comprising at least one resilient element arranged so as to be capable of transitioning to/from a state of bias such that exposure of the device to any undesirable physical forces is reduced to at least some extent.
2 Assignments
0 Petitions
Accused Products
Abstract
In one aspect, there is disclosed an apparatus for indexing a device about an indexing axis, the apparatus comprising an indexing drive mechanism comprising a drive portion configured in driving engagement with a driven member for indexing the device about the indexing axis. The driven member is arranged in operable association with an assembly comprising at least one resilient element arranged so as to be capable of transitioning to/from a state of bias such that exposure of the device to any undesirable physical forces is reduced to at least some extent.
-
Citations
37 Claims
-
1. An apparatus for indexing a device about an indexing axis, the apparatus comprising:
-
an indexing drive mechanism comprising a drive portion configured in driving engagement with a driven member for indexing the device about the indexing axis, the driven member arranged in operable association with an assembly comprising at least one resilient element arranged so as to be capable of transitioning to/from a state of bias such that exposure of the device to any undesirable physical forces is reduced to at least some extent. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 28, 30, 32, 33, 34, 35, 36, 37)
-
-
18. A method for performing a down hole surveying operation using a survey instrument, the method comprising:
-
recording data measured from a sensor when provided at a first measurement position and a second measurement position; acknowledging the time the data was recorded by way of a first timer;
acknowledging by way of a second timer, a point in time during the surveying operation, the first and second timers arranged so as to be synchronised with one another; andidentifying data recorded after said recorded point in time for use in preparing a survey report. - View Dependent Claims (19, 20, 21, 22, 23, 24, 25, 26, 27, 31)
-
-
29. A system for conducting a survey of a portion of a bore hole, the system comprising:
-
a survey instrument arranged for recording data measured from a sensor carried by the instrument when indexed between a first measurement position and a second measurement position during a survey period, the instrument having a first timer, a controller module provided remote from the instrument, the controller module having a second timer arranged so as to be substantially synchronised with the first timer, the controller module configured for identifying data recorded by the instrument from about a known point in time during the survey period, the controller module further configured for processing the identified data for providing a survey report.
-
Specification