OPTIMIZING REAL-TIME AND PLANNED AIR-TRAFFIC
First Claim
1. A method comprising:
- selecting an optimization model to reduce a number of passengers adversely affected by a delay of an aircraft;
determining a cascade boundary for a length of the delay, wherein the cascade boundary projects the delay at the plurality of airports;
computing, using the optimization model, a probability curve at an airport from the plurality of airports, wherein the probability curve outputs a second length of the delay experienced at the airport responsive to the cascade boundary projecting the delay on the airport;
adjusting in the optimization model the length, to form an adjusted length, such that a count of passengers adversely affected by the delay at the airport at the elapse of the second length is minimized; and
causing a target system to configure the aircraft to be delayed by the adjusted length.
1 Assignment
0 Petitions
Accused Products
Abstract
An optimization model is selected to reduce a number of passengers adversely affected by a delay of an aircraft. A cascade boundary is determined for a length of the delay, which projects the delay at the plurality of airports. Using the optimization model, a probability curve is computed at an airport from the plurality of airports, which outputs a second length of the delay experienced at the airport responsive to the cascade boundary projecting the delay on the airport. The length is adjusted in the optimization model such that a count of passengers adversely affected by the delay at the airport at the elapse of the second length is minimized. A target system is caused to configure the aircraft to be delayed by the adjusted length.
5 Citations
20 Claims
-
1. A method comprising:
-
selecting an optimization model to reduce a number of passengers adversely affected by a delay of an aircraft; determining a cascade boundary for a length of the delay, wherein the cascade boundary projects the delay at the plurality of airports; computing, using the optimization model, a probability curve at an airport from the plurality of airports, wherein the probability curve outputs a second length of the delay experienced at the airport responsive to the cascade boundary projecting the delay on the airport; adjusting in the optimization model the length, to form an adjusted length, such that a count of passengers adversely affected by the delay at the airport at the elapse of the second length is minimized; and causing a target system to configure the aircraft to be delayed by the adjusted length. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A computer usable program product comprising one or more computer-readable storage devices, and program instructions stored on at least one of the one or more storage devices, the stored program instructions comprising:
-
program instructions to select an optimization model to reduce a number of passengers adversely affected by a delay of an aircraft; program instructions to determine a cascade boundary for a length of the delay, wherein the cascade boundary projects the delay at the plurality of airports; program instructions to compute, using the optimization model, a probability curve at an airport from the plurality of airports, wherein the probability curve outputs a second length of the delay experienced at the airport responsive to the cascade boundary projecting the delay on the airport; program instructions to adjust in the optimization model the length, to form an adjusted length, such that a count of passengers adversely affected by the delay at the airport at the elapse of the second length is minimized; and program instructions to cause a target system to configure the aircraft to be delayed by the adjusted length. - View Dependent Claims (10, 11, 12, 13, 14, 15, 16, 17, 18)
-
-
19. A computer system comprising one or more processors, one or more computer-readable memories, and one or more computer-readable storage devices, and program instructions stored on at least one of the one or more storage devices for execution by at least one of the one or more processors via at least one of the one or more memories, the stored program instructions comprising:
program instructions to select an optimization model to reduce a number of passengers adversely affected by a delay of an aircraft; program instructions to determine a cascade boundary for a length of the delay, wherein the cascade boundary projects the delay at the plurality of airports; program instructions to compute, using the optimization model, a probability curve at an airport from the plurality of airports, wherein the probability curve outputs a second length of the delay experienced at the airport responsive to the cascade boundary projecting the delay on the airport; program instructions to adjust in the optimization model the length, to form an adjusted length, such that a count of passengers adversely affected by the delay at the airport at the elapse of the second length is minimized; and program instructions to cause a target system to configure the aircraft to be delayed by the adjusted length. - View Dependent Claims (20)
Specification