POWER CONTROL CONFIGURATION FOR UPLINK TRANSMISSIONS
First Claim
1. A method comprising:
- receiving a first configuration indicating a plurality of bandwidth parts on a first serving cell and configuration information corresponding to the plurality of bandwidth parts, wherein the configuration information comprises an open-loop power control configuration, a closed loop power control configuration, or a combination thereof corresponding to each bandwidth part of the plurality of bandwidth parts;
receiving scheduling information for a first uplink transmission on a first bandwidth part of the plurality of bandwidth parts;
determining a first transmission power for the first uplink transmission based on the configuration information and the scheduling information; and
performing the first uplink transmission with the first transmission power.
1 Assignment
0 Petitions
Accused Products
Abstract
Apparatuses, methods, and systems are disclosed for transmission power control. One method includes receiving a first configuration indicating a plurality of bandwidth parts on a first serving cell and configuration information corresponding to the plurality of bandwidth parts. The configuration information comprises an open-loop power control configuration, a closed loop power control configuration, or a combination thereof corresponding to each bandwidth part of the plurality of bandwidth parts. The method comprises receiving scheduling information for a first uplink transmission on a first bandwidth part of the plurality of bandwidth parts. The method comprises determining a first transmission power for the first uplink transmission based on the configuration information and the scheduling information. The method comprises performing the first uplink transmission with the first transmission power.
95 Citations
25 Claims
-
1. A method comprising:
-
receiving a first configuration indicating a plurality of bandwidth parts on a first serving cell and configuration information corresponding to the plurality of bandwidth parts, wherein the configuration information comprises an open-loop power control configuration, a closed loop power control configuration, or a combination thereof corresponding to each bandwidth part of the plurality of bandwidth parts; receiving scheduling information for a first uplink transmission on a first bandwidth part of the plurality of bandwidth parts; determining a first transmission power for the first uplink transmission based on the configuration information and the scheduling information; and performing the first uplink transmission with the first transmission power. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24)
-
-
25. An apparatus comprising:
-
a receiver that; receives a first configuration indicating a plurality of bandwidth parts on a first serving cell and configuration information corresponding to the plurality of bandwidth parts, wherein the configuration information comprises an open-loop power control configuration, a closed loop power control configuration, or a combination thereof corresponding to each bandwidth part of the plurality of bandwidth parts; and receives scheduling information for a first uplink transmission on a first bandwidth part of the plurality of bandwidth parts; and a processor that; determines a first transmission power for the first uplink transmission based on the configuration information and the scheduling information; and performs the first uplink transmission with the first transmission power.
-
Specification