PERMEABLE JOINT FOR PAVER AND STRUCTURAL SYSTEM THEREFOR
First Claim
1. A paver structural system having a permeable joint, the system comprising:
- at least two pavers partially defining a paved surface of the paver structural system, the at least two pavers partially defining a void therebetween;
a permeable joint located in the void between the at least two pavers, wherein the permeable joint also partially defines the paved surface, the permeable joint comprising;
a base layer formed of aggregate and bonded together with a non-cement binder; and
a membrane layer formed of aggregate that is sized smaller than the aggregate of the base layer, wherein the aggregate of the membrane is also bonded together with a non-cement binder, wherein the membrane layer is less permeable than the base layer, and wherein the membrane layer is located above the base layer.
1 Assignment
0 Petitions
Accused Products
Abstract
A structural system is provided that includes at least two pavers partially defining a paved surface, the pavers partially defining a void between them. The system also includes a permeable joint located in the void between the pavers, where the permeable joint also partially defines the paved surface. The permeable joint includes a base layer formed of aggregate and bonded together with a non-cement binder, and a membrane layer formed of aggregate that is sized smaller than the aggregate of the base layer, where the aggregate of the membrane is also bonded together with a non-cement binder. The membrane is less permeable than the base layer and is located above the base layer.
0 Citations
20 Claims
-
1. A paver structural system having a permeable joint, the system comprising:
-
at least two pavers partially defining a paved surface of the paver structural system, the at least two pavers partially defining a void therebetween; a permeable joint located in the void between the at least two pavers, wherein the permeable joint also partially defines the paved surface, the permeable joint comprising; a base layer formed of aggregate and bonded together with a non-cement binder; and a membrane layer formed of aggregate that is sized smaller than the aggregate of the base layer, wherein the aggregate of the membrane is also bonded together with a non-cement binder, wherein the membrane layer is less permeable than the base layer, and wherein the membrane layer is located above the base layer. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. A method of placing the paver structural system having a permeable joint, the system comprising:
-
laying at least two pavers on a substrate layer; spacing the at least two pavers from each other in a spaced arrangement forming joint voids therebetween; forming a first slurry containing aggregate, water and a non-cement binder to form the base layer; applying the base layer of the permeable joint over the paver structural system, and placing the base layer into the joint voids; curing the base layer for at least 30-minutes; forming a second slurry containing aggregate, water and a non-cement binder to form the membrane layer, wherein the aggregate of the second slurry is smaller than the aggregate of the first slurry; and applying the membrane layer of the permeable joint over the paver structural system, and placing the membrane layer into the joint voids and on top of the base layer. - View Dependent Claims (11, 12, 13, 14, 15, 16, 17, 18)
-
-
19. A permeable joint for a paver structural system having individual pavers that form a paved surface, the permeable joint comprising:
-
a base layer comprising aggregate sized in the range of #4 to #20 ASTM and a two-part permeable epoxy binder having a foaming agent; and a membrane layer comprising aggregate sized in the range of #20 to #50 ASTM and the two-part permeable epoxy binder having the foaming agent; wherein the base layer is mixed into a slurry with water and deposited between the individual pavers; and wherein the membrane layer is mixed into a second slurry with water and deposited between the individual pavers and above the base layer. - View Dependent Claims (20)
-
Specification