SYSTEM AND METHOD FOR CONDUCTING SUBTERRANEAN OPERATIONS
First Claim
Patent Images
1. A tubular handling system for conducting subterranean operations comprising:
- a bridge disposed within a tubular storage area and coupled to a guide rail, wherein the bridge is configured to translate from a first bridge position to a second bridge position along the guide rail and over the tubular storage area;
an arm coupled to the bridge; and
a gripper coupled to the arm and adapted to engage a first tubular.
2 Assignments
0 Petitions
Accused Products
Abstract
A tubular handling system for conducting subterranean operations is disclosed and can include a bridge disposed within a tubular storage area and coupled to a guide rail. The bridge is configured to translate from a first bridge position to a second bridge position along the guide rail and over the tubular storage area. The tubular handling system can further include an arm coupled to the bridge and a gripper coupled to the arm. The gripper can be adapted to engage a first tubular.
-
Citations
20 Claims
-
1. A tubular handling system for conducting subterranean operations comprising:
-
a bridge disposed within a tubular storage area and coupled to a guide rail, wherein the bridge is configured to translate from a first bridge position to a second bridge position along the guide rail and over the tubular storage area; an arm coupled to the bridge; and a gripper coupled to the arm and adapted to engage a first tubular. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A tubular handling system for conducting subterranean operations comprising:
-
a bridge; an arm coupled to the bridge and configured to translate along a length of the bridge; and a gripper coupled to the arm and adapted to engage a first tubular in a tubular storage area. - View Dependent Claims (7, 8, 9, 10, 11, 12, 13, 14)
-
-
15. A tubular handling system for conducting subterranean operations comprising:
-
a bridge comprising a first portion and a second portion; an arm coupled to the bridge between the first portion and the second portion; a gripper coupled to the arm and adapted to engage with a first tubular in a tubular storage area; and wherein the arm is adapted to move a tubular between the first portion and the second portion of the bridge upon moving the tubular from a pick-up position to a delivered position. - View Dependent Claims (16, 17, 18, 19, 20)
-
Specification