×

PULSED LEADER CONSENSUS MANAGEMENT

  • US 20200034048A1
  • Filed: 01/30/2015
  • Published: 01/30/2020
  • Est. Priority Date: 01/30/2015
  • Status: Active Grant
First Claim
Patent Images

1. A method for managing storage, the method comprising:

  • receiving a read request for data managed by a group of two or more nodes at a node of the group of two or more nodes, wherein a leader node is elected from the group of two or more nodes;

    determining that a sync state of the leader node is expire, the sync state corresponding to the read request and to the group of two or more nodes, wherein the sync state is expired at least because the leader node has failed or is unresponsive; and

    reading from two or more storage devices using a plurality of nodes in response to the read request while the leader node has failed or is unresponsive, the node implementing a consensus scheme before a new leader node is elected to identify data to transmit to one or more users associated with the read request.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×