CRANE CONTROL SYSTEM AND CRANE CONTROL METHOD
First Claim
1. A crane control system for controlling a crane that includes a leg structure standing on a quay,a girder part supported on the leg structure and having one end projecting to a sea side from the structure and another end projecting to a land side from the structure,a relay mounting platform which is configured to be movable in at least one of a vertical direction and an extending direction of the girder part at a center portion of the girder part in the extending direction and on which a container is temporarily mounted,a land-side cargo handling device which performs container handling between the relay mounting platform and a transportation vehicle stopped at a vehicle stop position under the other end of the girder part, anda sea-side cargo handling device which performs container handling between the relay mounting platform and a designated cargo handling position on a container ship moored under the one end of the girder part,wherein the crane control system comprises:
- a position acquisition device which acquires current positions of the land-side cargo handling device, the sea-side cargo handling device, and the transportation vehicle; and
a control device which is connected to the sea-side cargo handling device, the land-side cargo handling device, the relay mounting platform, and the position acquisition device,the vehicle stop position and the cargo handling position have been set in the control device in advance, andthe crane control system is configured such that when the control device predicts that a standby time will occur in a container handling operation by one cargo handling device among the land-side cargo handling device and the sea-side cargo handling device based on the set vehicle stop position, the set cargo handling position, and the current positions of the land-side cargo handling device, the sea-side cargo handling device, and the transportation vehicle acquired by the position acquisition device, the control device performs control that moves the relay mounting platform to a position which equalizes a cycle time of the container handling operation by the one cargo handling device including the predicted standby time and a cycle time of the container handling operation by the other cargo handling device with each other.
2 Assignments
0 Petitions
Accused Products
Abstract
A control system for a quay crane a mounting platform position acquisition device, a land-side position acquisition device, a transportation vehicle position acquisition device, and a control device. The control system 30 is configured such that, when the control device predicts that a standby time will occur for a land-side cargo handling device based on a vehicle stop position, a current position of a relay mounting platform, a current position of the land-side cargo handling device, and a current position of an in-terminal transportation vehicle, the control device performs control that moves the relay mounting platform to a relay position which equalizes an actual land-side cycle time for the land-side cargo handling device including the standby time and a sea-side cycle time for a sea-side cargo handling device with each other.
0 Citations
9 Claims
-
1. A crane control system for controlling a crane that includes a leg structure standing on a quay,
a girder part supported on the leg structure and having one end projecting to a sea side from the structure and another end projecting to a land side from the structure, a relay mounting platform which is configured to be movable in at least one of a vertical direction and an extending direction of the girder part at a center portion of the girder part in the extending direction and on which a container is temporarily mounted, a land-side cargo handling device which performs container handling between the relay mounting platform and a transportation vehicle stopped at a vehicle stop position under the other end of the girder part, and a sea-side cargo handling device which performs container handling between the relay mounting platform and a designated cargo handling position on a container ship moored under the one end of the girder part, wherein the crane control system comprises: -
a position acquisition device which acquires current positions of the land-side cargo handling device, the sea-side cargo handling device, and the transportation vehicle; and a control device which is connected to the sea-side cargo handling device, the land-side cargo handling device, the relay mounting platform, and the position acquisition device, the vehicle stop position and the cargo handling position have been set in the control device in advance, and the crane control system is configured such that when the control device predicts that a standby time will occur in a container handling operation by one cargo handling device among the land-side cargo handling device and the sea-side cargo handling device based on the set vehicle stop position, the set cargo handling position, and the current positions of the land-side cargo handling device, the sea-side cargo handling device, and the transportation vehicle acquired by the position acquisition device, the control device performs control that moves the relay mounting platform to a position which equalizes a cycle time of the container handling operation by the one cargo handling device including the predicted standby time and a cycle time of the container handling operation by the other cargo handling device with each other. - View Dependent Claims (2, 3, 4, 6, 7, 8, 9)
-
-
5. A crane control method comprising the steps of:
-
moving a relay mounting platform in at least one of a vertical direction and an extending direction of a girder part at a center portion of the girder part in the extending direction, the girder part being supported on a leg structure which stands on a quay, having one end projecting to a sea side from the structure, and having another end projecting to a land side from the structure; causing a land-side cargo handling device to perform container handling between the relay mounting platform and a transportation vehicle stopped at a vehicle stop position under the land side of the girder part while causing a sea-side cargo handling device to perform container handling between the relay mounting platform and a cargo handling position on a container ship moored under the sea side of the girder part; consecutively acquiring current positions of the land-side cargo handling device, the sea-side cargo handling device, and the transportation vehicle; predicting whether a standby time will occur in a container handling operation by one cargo handling device among the land-side cargo handling device and the sea-side cargo handling device based on the vehicle stop position and the cargo handling position, which have been set in advance, and the acquired current positions of the land-side cargo handling device, the sea-side cargo handling device, and the transportation vehicle; when the standby time is predicted to occur, calculating a position which equalizes a cycle time of the container handling operation by the one cargo handling device including the standby time and a cycle time of the container handling operation by the other cargo handling device with each other; and moving the relay mounting platform to the calculated equalizing position.
-
Specification