×

COMPLETING SLIM-HOLE HORIZONTAL WELLBORES

  • US 20200131861A1
  • Filed: 10/24/2018
  • Published: 04/30/2020
  • Est. Priority Date: 10/24/2018
  • Status: Active Grant
First Claim
Patent Images

1. A coiled tubing wellbore completion comprising:

  • a length of coiled tubing installed into a horizontal side-track wellbore, the coiled tubing having a pre-perforated section defining perforations between a first end of the perforated section and a second end of the perforated section, the perforated section positioned to align with a zone of interest within the horizontal side-track wellbore;

    a first pre-installed isolation packer surrounding the length of coiled tubing, the first isolation packer attached to the length of coiled tubing at the first end of the pre-perforated section; and

    a second pre-installed isolation packer surrounding the length of coiled tubing, the second isolation packer attached to the length of coiled tubing at the second end of the pre-perforated section.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×