×

System, method, and apparatus for settlement for participation in an electric power grid

  • US 20200134744A1
  • Filed: 12/23/2019
  • Published: 04/30/2020
  • Est. Priority Date: 10/24/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method for market-based financial settlement in an electric power grid, comprising:

  • at least one active grid element participating in the electric power grid by consuming power, supplying power, and/or curtailing power to provide operating reserves and/or grid stability for the electric power grid;

    the at least one active grid element generating at least one kilowatt packet (KWP) unit based upon measured data for the participation of the at least one active grid element in the electric power grid, wherein the at least one KWP unit provides a quantifying market rate for monetization for any units of kilowatts with respect to time and the measured data is based on revenue grade metrology;

    the at least one active grid element transmitting at least one Internet Protocol (IP)-based settlement message to a settlement processor, wherein the at least one IP-based settlement message comprises the at least one KWP unit; and

    the settlement processor providing a market-based financial settlement for the participation of the at least one active grid element based on the at least one KWP unit in real time or near real time.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×