KNOW-HOW PREPARING DEVICE, KNOW-HOW PREPARING METHOD, AND KNOW-HOW PREPARING PROGRAM
First Claim
1. A know-how preparing device comprising:
- a storage unit configured to store event data prepared by associating events relating to a value of any one or a combination of items included in time series data collected from equipment with associated data of each of the events including identification information of an operator;
an extraction section configured to extract the event data that are linked with an operator included in a predetermined period during an operating time of the equipment for each of the operators;
a preparation section configured to prepare feature data relating to an operation procedure and a work time for each of the operators on a basis of the event data extracted for each of the operators; and
an output section configured to output the feature data.
1 Assignment
0 Petitions
Accused Products
Abstract
An edge server includes a storage unit that stores event data prepared by associating events relating to a value of any of items or a combination of the items included in time series data collected from equipment with associated data of each of the events including identification information of an operator; an extraction section that extracts the event data that are linked with an operator included in a predetermined period during an operating time of the equipment for each of the operators; a preparation section that prepares feature data relating to an operation procedure and a work time for each of the operators on a basis of the even data extracted for each of the operators; and an output section that outputs the feature data.
12 Citations
7 Claims
-
1. A know-how preparing device comprising:
-
a storage unit configured to store event data prepared by associating events relating to a value of any one or a combination of items included in time series data collected from equipment with associated data of each of the events including identification information of an operator; an extraction section configured to extract the event data that are linked with an operator included in a predetermined period during an operating time of the equipment for each of the operators; a preparation section configured to prepare feature data relating to an operation procedure and a work time for each of the operators on a basis of the event data extracted for each of the operators; and an output section configured to output the feature data. - View Dependent Claims (2, 3, 4, 5, 7)
-
-
6. A know-how preparing method executed by a computer, the method comprising the steps of:
-
extracting, from among event data prepared by associating events relating to a value of any one or a combination of items included in time series data collected from equipment with associated data of each of the events including identification information of an operator, the event data that are linked with an operator included in a predetermined period during an operating time of the equipment for each of the operators; preparing feature data relating to an operation procedure and a work time for each of the operators on a basis of the event data extracted for each of the operators; and outputting the feature data.
-
Specification