Closed vessel curing of concrete
First Claim
Patent Images
1. IN THE PROCESS FOR CURING A WET CONCRETE LINER WITHIN A WATER TANK, THE STEPS OF INTRODUCING INTO THE TANK CO2 IN THE PROPORTION OF ONE CUBIC FOOT OF CO2 AT ATMOSPHERIC PRESSURE AND ROOM TEMPERATURE FOR 40-80 SQUARE FEET OF CONCRETE SURFACE, THE SAID CO2 PROVIDING AT LEAST ABOUT 15% OT THE ATMOSPHERE WITHIN THE TANK, SEALING THE TANK TO EXCLUDE ACCESS OF AIR, AND CURING THE CONCRETE UNDER THE MOIST CONDITIONS PREVAILING IN THE SEALED TANK AND FOR A PERIOD UP TO ABOUT 28 DAYS.
0 Assignments
0 Petitions
Accused Products
-
Citations
1 Claim
-
1. IN THE PROCESS FOR CURING A WET CONCRETE LINER WITHIN A WATER TANK, THE STEPS OF INTRODUCING INTO THE TANK CO2 IN THE PROPORTION OF ONE CUBIC FOOT OF CO2 AT ATMOSPHERIC PRESSURE AND ROOM TEMPERATURE FOR 40-80 SQUARE FEET OF CONCRETE SURFACE, THE SAID CO2 PROVIDING AT LEAST ABOUT 15% OT THE ATMOSPHERE WITHIN THE TANK, SEALING THE TANK TO EXCLUDE ACCESS OF AIR, AND CURING THE CONCRETE UNDER THE MOIST CONDITIONS PREVAILING IN THE SEALED TANK AND FOR A PERIOD UP TO ABOUT 28 DAYS.
Specification