×

System for remotely controlling the operation of a power distribution network

  • US 3,359,551 A
  • Filed: 01/24/1963
  • Issued: 12/19/1967
  • Est. Priority Date: 01/24/1963
  • Status: Expired due to Term
First Claim
Patent Images

1. A LOAD CONTROL SYSTEM COMPRISING:

  • (A) A POWER LINE;

    (B) A PLURALITY OF OSCILLATORS FOR SUPPLYING CARRIER SIGNALS OF DIFFERENT FREQUENCIES TO SAID POWER LINE;

    (C) A RELAY MEANS ASSOCIATED WITH EACH OSCILLATOR;

    (D) MEANS INTERPOSED BETWEEN SAID VARIOUS RELAY MEANS AND SAID POWER LINE FOR CONNECTING EACH RELAY MEANS TO SAID POWER LINE SO AS TO APPLY A CARRIER SIGNAL TO SAID LINE HAVING THE FREQUENCY OF THE OSCILLATOR WITH WHICH THE PARTICULAR RELAY MEANS THAT IS THEN CONNECTED IS ASSOCIATED;

    (E) MEANS FOR TRIGGERING SAID LAST-MENTIONED MEANS INTO OPERATION A PRESCRIBED NUMBER OF TIMES SO AS TO INTERRUPTEDLY APPLY THAT CARRIER SIGNAL TO SAID LINE AND THEREBY PROVIDE A SERIES OF PULSES FOR TRANSMISSION ALONG SAID LINE;

    (F) MEANS FOR PRESELECTING THE SEQUENCE SAID RELAY MEANS ARE TO BE ENERGIZED;

    (G) MEANS CONNECTED TO SAID DETERMINING MEANS FOR STARTING SAID TRIGGERING MEANS EACH TIME A RELAY MEANS IS ENERGIZED;

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×