×

Fluid loss control

  • US 3,417,821 A
  • Filed: 06/08/1966
  • Issued: 12/24/1968
  • Est. Priority Date: 06/08/1966
  • Status: Expired due to Term
First Claim
Patent Images

1. THE METHOD OF FRACTURING IN A WELL TRAVERSING A PRODUCING ZONE WHICH COMPRISES INJECTING INTO THE FORMATION IN THE VICINITY OF THE PRODUCING ZONE A FRACTURING FLUID COMPRISING A FRACTURING FLUID CONTIANING AN EFFECTIVE

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×