×

EXTRACTION CONTROL SYSTEM FOR A TURBOGENERATOR SET

  • US 3,724,214 A
  • Filed: 03/05/1971
  • Issued: 04/03/1973
  • Est. Priority Date: 03/05/1971
  • Status: Expired due to Term
First Claim
Patent Images

1. In a turbogenerator set comprising a first turbine unit having a first motive steam inlet control valve and an extraction steam outlet, a second turbine unit having a second motive steam inlet control valve provided with steam by said extraction steam outlet, said extraction steam outlet also being adapted to supply steam to a process having varying steam demands, and a load carried by said first and second turbine units;

  • a control system for maintaining a set speed on said turbines and supplying said varying demands for steam of said process comprising means responsive to the speed of the turbine unit for jointly governing said first and second inlet control valves, and means responsive to the steam pressure in said extraction steam outlet for opposing and modifying the governing effect of said speed responsive means on said first inlet control valve to supply the varying demands of steam of said process and maintaining a set speed on said turbines.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×