Method for assembling a preformed floor and roof structure
First Claim
Patent Images
1. The process of on site construction of a building section utilizing a series of structural rails of tubular configuration and a set of panels, which comprises:
- a. progressively connecting the structural rails into a rectangular grid by the aid of connector structures telescopically received in the tubular portions of the rails;
b. inserting panels into each rectangle before the rectangle is closed by a rail;
c. progressively closing rectangular elements of the grid and thereby interlocking said panels.
0 Assignments
0 Petitions
Accused Products
Abstract
The prefabricated building structure comprises a series of metal or structural rails and a set of panels. At the installation site, the rails are progressively built into a rectangular grid as the panels are captured by the progressively closing grid, the panels having peripheral grooves interlocked by the rails.
4 Citations
2 Claims
-
1. The process of on site construction of a building section utilizing a series of structural rails of tubular configuration and a set of panels, which comprises:
- a. progressively connecting the structural rails into a rectangular grid by the aid of connector structures telescopically received in the tubular portions of the rails;
b. inserting panels into each rectangle before the rectangle is closed by a rail;
c. progressively closing rectangular elements of the grid and thereby interlocking said panels.
- a. progressively connecting the structural rails into a rectangular grid by the aid of connector structures telescopically received in the tubular portions of the rails;
-
2. The process set forth in claim 1 together with the step of laying said rails upon a structural corner support, and including the step of securing said building section to said corner supports by nailing the corners of the panels to said supports independently of said rails.
Specification