Combined gas/steam power plant with pressurized-gas generator
First Claim
1. A combined gas-steam power plant comprising a gas turbine power set which includes a combustion chamber, a gas turbine for delivering power and a compressor driven thereby for delivering air to said combustion chamber, a steam turbine power set including a non-supercharged steam generator connected directly to the outlet from said gas turbine, and a steam turbine for delivering power, at least two pressurized gas generators for producing fuel gas for firing said combustion chamber and steam generator, respectively at least two separate and independent charging groups each comprising a gas turbine and a compressor driven thereby the gasification air required for generation of that portion of the fuel gas supplied to said combustion chamber being taken from the combustion air conveyed by the compressor of said gas turbine power set and compressed further in the compressor of one of said charging groups up to the pressure prevailing in one of said fuel generators, the gasification air required for generation of that portion of the fuel gas supplied to said steam generator being compressed in the compressor of the other charging group from ambient pressure to the pressure prevailing in the other fuel gas generator, and the said two proportions of the fuel gas produced respectively by said fuel gas generators being passed through the gas turbine of their respective charging groups and thence to said combustion chamber and steam generator, respectively.
0 Assignments
0 Petitions
Accused Products
Abstract
A combined gas/steam power plant includes a gas turbine power set for delivering power such as for driving an electrical generator which comprises a combustion chamber, a gas turbine and a compressor driven by it, and a steam power plant comprising a steam generator and a steam turbine for delivering power such as for driving another electrical generator. Gas generators produce fuel gas for firing the combustion chamber and steam generator respectively. Independent charging groups, each comprising a gas turbine and compressor, are provided for the combustion chamber and steam generator respectively. Gasification air for generating the portion of fuel gas supplied to the combustion chamber is taken from the combustion air conveyed by the compressor of the gas turbine power set and compressed further in the compressor of the charging group allocated to the combustion chamber up to the pressure prevailing in the appertaining fuel gas generator. Gasification air for generating the portion of fuel gas supplied to the steam generator is compressed in the compressor of the other charging group allocated to the steam generator from ambient pressure up to the pressure prevailing in the appertaining fuel gas generator, and the two portions of the fuel gas are passed through the gas turbines of their respective charging groups and thence to the combustion chamber and steam generator. In addition, the steam generator, which is not supercharged, is connected directly to the outlet of the power delivering gas turbine.
-
Citations
4 Claims
- 1. A combined gas-steam power plant comprising a gas turbine power set which includes a combustion chamber, a gas turbine for delivering power and a compressor driven thereby for delivering air to said combustion chamber, a steam turbine power set including a non-supercharged steam generator connected directly to the outlet from said gas turbine, and a steam turbine for delivering power, at least two pressurized gas generators for producing fuel gas for firing said combustion chamber and steam generator, respectively at least two separate and independent charging groups each comprising a gas turbine and a compressor driven thereby the gasification air required for generation of that portion of the fuel gas supplied to said combustion chamber being taken from the combustion air conveyed by the compressor of said gas turbine power set and compressed further in the compressor of one of said charging groups up to the pressure prevailing in one of said fuel generators, the gasification air required for generation of that portion of the fuel gas supplied to said steam generator being compressed in the compressor of the other charging group from ambient pressure to the pressure prevailing in the other fuel gas generator, and the said two proportions of the fuel gas produced respectively by said fuel gas generators being passed through the gas turbine of their respective charging groups and thence to said combustion chamber and steam generator, respectively.
Specification