×

Cleaning and preservation unit for turbine engine

  • US 4,059,123 A
  • Filed: 10/18/1976
  • Issued: 11/22/1977
  • Est. Priority Date: 10/18/1976
  • Status: Expired due to Term
First Claim
Patent Images

1. Apparatus for cleaning and preservation of a gas turbine engine, said engine having a starting motor for cranking the rotary compressor stages thereof, comprising in combination:

  • a frame structure having supporting wheels journaled for rotation;

    a first reservoir mounted on said frame, said first reservoir being partially filled with water;

    additional reservoirs for cleaner, solvent and preservative solutions mounted on said frame;

    an internal combustion engine, a control console, a rotary air compressor and an alternator also mounted on said frame, said internal combustion engine being drivingly coupled to both said air compressor and said alternator;

    an electric storage battery mounted in a compartment of said control console;

    electrical connections between said alternator and said battery for charging said battery, said electrical connections including operator-manipulated control means for controlling the energy transfer from said alternator to said battery;

    fluid connection means between said air compressor and said first reservoir for pressurizing said first reservoir with a volume of compressed air;

    fluid connections between said volume of air and each of said additional reservoirs for pressurizing said additional reservoirs;

    manually operable controll means in each of said connections for controlling the pressurization of each of said reservoirs;

    nozzle apparatus mountable on said gas turbine engine for spraying the inside thereof with fluids;

    means for connecting each of said reservoirs to said nozzle apparatus, said means including a high pressure hose selectively connected to said reservoirs; and

    encircuiting means including a two-conductor electrical cable connecting said battery to said starting motor for cranking said rotary compressor stages.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×