×

Controlled additive metering system

  • US 4,265,266 A
  • Filed: 01/23/1980
  • Issued: 05/05/1981
  • Est. Priority Date: 01/23/1980
  • Status: Expired due to Term
First Claim
Patent Images

1. A material storage and metering system, comprising:

  • first storage means for storing a first solid phase material;

    first metering means for transferring said first material from said first storage means at a controlled flow rate within a first range of flow rates for blending with a flowing primary substance, said first range being defined with a low end and a high end;

    second storage means, for storing a second solid phase material;

    second metering means for transferring said second material from said second storage means at a controlled flow rate within a second range of flow rates for blending with said flowing primary substance, said second range being defined by a low end and a high end, said high end of said second range being at least substantially as great as said low end of said first range; and

    control station means, responsive to the flow rates of said first and second materials, and to a flow rate of said primary substance, for providing the controlled flow rates of said first and second materials, said control station means including;

    material determining means for determining the amounts of said first material and said second material being discharged from said first storage means and said second storage means;

    primary substance sensing means for sensing the amount of said primary substance being discharged from a primary substance container; and

    controlling means, responsive to said material determining means and said primary substance sensing means, for controlling the amounts of said first and second materials being discharged from said first and second storage means;

    wherein said first metering means includes;

    metering bin means for receiving said first material from said first storage means; and

    conveyor means, controlled by said controlling means, for discharging said first material from said first metering bin means at said controlled flow rate within said first range of flow rates.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×