Load demand control system
First Claim
1. In a load demand control system for limiting the total average electrical load, for a predetermined moving interval of time, to an installation having at least one large electric load device to be operated a portion of an interval of time, comprising,load demand control means having an input electrical power sensing means for sensing the input power to an installation and a plurality of load control circuits for selectively controlling various loads of the installation to shed loads when said input power exceeds a first predetermined value,timer control means selectively operated when the one large electric load device is to be operated, said timer control means comprising,first means for resetting said first predetermined value of said load demand control means to a second predetermined value to cause said load demand control means to shed loads to maintain the input power below said second predetermined value for a first predetermined time period, andsecond means adapted to be controlled by said timer control means to subsequently initiate operation of said large load device after said first predetermined time period for a second predetermined time period, whereby the total average input power for a predetermined moving interval of time is maintained at a minimum value.
0 Assignments
0 Petitions
Accused Products
Abstract
A load demand control system for limiting the total average electric load over a moving predetermined time interval to an installation having at least one large load device, making use of a timer control which can be selectively operated by an operator upon the need for the operation of the one large electrical load. The timer control first resets the control point of the load demand control of the installation at some low predetermined value. Subsequently, the timer control turns on the large load for a predetermined period of time and after its operation, the timer control maintains the low predetermined value of the load demand control for a further predetermined time period whereby the total moving average electrical load to the installation for the total time interval of the timer control is maintained below a predetermined peak electrical load value set for the installation.
27 Citations
10 Claims
-
1. In a load demand control system for limiting the total average electrical load, for a predetermined moving interval of time, to an installation having at least one large electric load device to be operated a portion of an interval of time, comprising,
load demand control means having an input electrical power sensing means for sensing the input power to an installation and a plurality of load control circuits for selectively controlling various loads of the installation to shed loads when said input power exceeds a first predetermined value, timer control means selectively operated when the one large electric load device is to be operated, said timer control means comprising, first means for resetting said first predetermined value of said load demand control means to a second predetermined value to cause said load demand control means to shed loads to maintain the input power below said second predetermined value for a first predetermined time period, and second means adapted to be controlled by said timer control means to subsequently initiate operation of said large load device after said first predetermined time period for a second predetermined time period, whereby the total average input power for a predetermined moving interval of time is maintained at a minimum value.
-
3. An improvement in a load demand control system having an input power sensing means for sensing the total electrical demand of an installation for maintaining the total average electrical power load over a predetermined moving interval of time below a predetermined value wherein upon the operation of a large electrical load for a portion of the time interval other loads having lower priority are shed,
the improvement comprising, timer means operated upon the anticipation of a need of an operation of a large load to delay the energization of said large load for a selected time during a time period and to control the shedding of certain of the other loads at the beginning of said time period prior to the energization of said large load to maintain a low average power load after the large load is deenergized over the total interval of said time period.
-
5. In a load demand control system for limiting the total average electric load for a predetermined moving interval of time as determined by a power supplier for an installation having at least one large electrical load device to be operated for a total time period less than the predetermined moving interval of time, comprising,
load demand control means for controlling a plurality of electrical loads in response to the total input power of an installation to maintain the average total power for a predetermined moving interval of time taken and any time at a minimum, timer control means operated on anticipation of the need of operation of the large electrical load device, said timer means first resetting a control point of said load demand control means to reduce the input electrical power use of the installation for a first period of time by shedding low priority electrical loads and then energizing said large electrical load device for a period of time less than said interval.
-
8. In a load demand control system for limiting the average total over a predetermined power measuring period of time the electrical load of an installation by anticipation, the operation of at least one large load device having an operation controlled by a timer device, comprising
-
9. a load demand control means having means adapted for sensing the incoming electrical load of an installation and relay means adapted for connection to various electrical loads of the installation for shedding the loads when the incoming electrical power to the installation exceeds a first predetermined value as selected by a reset control circuit,
timer control means having a plurality of switch means controlled in sequence upon the energization of said timer control means upon anticipation of the need of operation of one of the large load devices, a first of said plurality of switch means being connected to said reset control circuit to change said first predetermined value to a second lower predetermined value of incoming electrical power, controlled by said load demand control means, a second of said plurality of said switch means being adapted to be connected to the timer device to subsequently start the operation of the one large load device, said first switch means maintaining said lower predetermined value for a first time period before the operation of the one large load device so that when the large load device is energized by its timer device the average incoming power to said installation will be lower throughout the operation of the large load device.
Specification