×

Multi-zone energy supply controller

  • US 4,335,320 A
  • Filed: 02/13/1980
  • Issued: 06/15/1982
  • Est. Priority Date: 02/13/1980
  • Status: Expired due to Term
First Claim
Patent Images

1. A controller for the power supply system of a structure having multiple zones therein with separate heating, ventilating and air-conditioning apparatus for individual zones, said structure having other separate apparatus associated therewith and having means at said controller for automatically selectively controlling the availability for operation of individual elements of said separate apparatus on power demand and time bases, wherein the improvement comprises means at said controller for selectively overriding said availability controlling means for selectively allowing individual elements of said separate apparatus to be available to operate independent of said controlling on said time bases, means associated with said separate apparatus for individually monitoring environmental conditions in at least some of said zones, means responsive to said monitoring means and connected thereto for causing the corresponding separate apparatus to operate during the existence of predetermined environmental conditions in a zone so monitored subject to said availability, selective means at said controller for determining and displaying the measure of said environmental conditions in a zone so monitored as sensed by said monitoring means, and said selective means at said controller comprises means for simultaneously for a selected zone (a) disconnecting said monitoring means from said responsive means, (b) connecting said monitoring means to said determining and displaying means for said determining and displaying said sensed environmental condition measure, and (c) connecting a dummy load to said responsive means while said monitoring means is so disconnected therefrom.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×