×

Duty cycle controller

  • US 4,453,590 A
  • Filed: 07/12/1982
  • Issued: 06/12/1984
  • Est. Priority Date: 07/12/1982
  • Status: Expired due to Fees
First Claim
Patent Images

1. A duty cycle controller for an air conditioning system including cooling means, heating means, and a thermostat having a cooling switch and a heating switch comprising:

  • a first solid state switch means adapted to be connected in series with the cooling switch of the thermostat in a circuit, said first switch means for energizing the cooling means of the air conditioner when conductive during a cooling cycle of operation;

    a second solid state switch means adapted to be connected in series with the heating switch of the thermostat in a circuit said second switch means for energizing the heating means of an air conditioner when conductive during a heating cycle of operation;

    switch control circuit means for causing said first and second switch means to be conductive when set and nonconductive when reset;

    timing means including means for producing clock pulses at a single frequency and digital counter means to which the clock pulses are applied for producing timing pulses at predetermined time intervals during each cycle of operation for setting the switch control circuit means to render each of the switch means conductive for different periods of time which periods differ by amounts equal to an integer times the period of the clock pulses, and for resetting the switch control means to render each of said switch means nonconductive for different periods of time;

    safety means for preventing the switch control means from rendering said switch means conductive for a predetermined delay period after a power interruption or after a thermostat switch opens after having been closed; and

    control means for initiating the conductive period for the switch means at the time a thermostat switch closes.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×