1. A duty cycle controller for an air conditioning system including cooling means, heating means, and a thermostat having a cooling switch and a heating switch comprising:
- a first solid state switch means adapted to be connected in series with the cooling switch of the thermostat in a circuit, said first switch means for energizing the cooling means of the air conditioner when conductive during a cooling cycle of operation;
a second solid state switch means adapted to be connected in series with the heating switch of the thermostat in a circuit said second switch means for energizing the heating means of an air conditioner when conductive during a heating cycle of operation;
switch control circuit means for causing said first and second switch means to be conductive when set and nonconductive when reset;
timing means including means for producing clock pulses at a single frequency and digital counter means to which the clock pulses are applied for producing timing pulses at predetermined time intervals during each cycle of operation for setting the switch control circuit means to render each of the switch means conductive for different periods of time which periods differ by amounts equal to an integer times the period of the clock pulses, and for resetting the switch control means to render each of said switch means nonconductive for different periods of time;
safety means for preventing the switch control means from rendering said switch means conductive for a predetermined delay period after a power interruption or after a thermostat switch opens after having been closed; and
control means for initiating the conductive period for the switch means at the time a thermostat switch closes.
1 Assignment
0 Petitions
Accused Products
Abstract
A duty cycle controller for an air conditioning system. Solid state switches are connected in series with the heating and cooling switches of a thermostat in circuits for energizing the cooling and heating subsystems, respectively, of an air conditioner. A switch control circuit, when enabled, causes the solid state switches to be conductive when set and nonconductive when reset. Timing signals from a counter applied to the switch control circuit determine the state of the switch control circuit and thus the duty cycles for the heating and cooling subsystem. The controller is provided with a safety circuit which disables the switch control circuit to render the solid state switches nonconductive for a predetermined period of time after a power interruption or after a cooling or heating switch of the thermostat opens. The controller assures that each heating and cooling duty cycle begins with a full energization period. The length of the heating and cooling duty cycles can be readily varied.
29 Citations
10 Claims
-
1. A duty cycle controller for an air conditioning system including cooling means, heating means, and a thermostat having a cooling switch and a heating switch comprising:
-
a first solid state switch means adapted to be connected in series with the cooling switch of the thermostat in a circuit, said first switch means for energizing the cooling means of the air conditioner when conductive during a cooling cycle of operation; a second solid state switch means adapted to be connected in series with the heating switch of the thermostat in a circuit said second switch means for energizing the heating means of an air conditioner when conductive during a heating cycle of operation; switch control circuit means for causing said first and second switch means to be conductive when set and nonconductive when reset; timing means including means for producing clock pulses at a single frequency and digital counter means to which the clock pulses are applied for producing timing pulses at predetermined time intervals during each cycle of operation for setting the switch control circuit means to render each of the switch means conductive for different periods of time which periods differ by amounts equal to an integer times the period of the clock pulses, and for resetting the switch control means to render each of said switch means nonconductive for different periods of time; safety means for preventing the switch control means from rendering said switch means conductive for a predetermined delay period after a power interruption or after a thermostat switch opens after having been closed; and control means for initiating the conductive period for the switch means at the time a thermostat switch closes. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A duty cycle controller for controlling the energization of heating and cooling means of an air conditioner in response to heating or cooling signals produced by a thermostat, said controller adapted to be connected to a source of electrical power, comprising:
-
resetable clock means for producing clock pulses at a constant frequency; resetable counter means to which the clock pulses are applied to produce timing pulses; cooling switch means adapted to be connected in series in the cooling energization circuit for the cooling means of the air conditioner; heating switch means adapted to be connected in series in the heating energization circuit of the heating means of the air conditioner; switch control means to which said timing pulses are selectively applied to render the cooling and heating switch means conductive for a conductive period and nonconductive for a nonconductive period; safety means for preventing the switch control means from permitting the switch means to become conductive for a predetermined safety period after the occurrence of a power interruption or after the termination of a heating or cooling signal by the thermostat; means for resetting the clock means and counter means when the heating or cooling signal is first produced by the thermostat; and means for resetting the clock and counter means at the end of the safety period if a heating or cooling signal is produced by the thermostat during such safety period. - View Dependent Claims (7, 8, 9, 10)
-
Specification