×

System and method for optimizing power shed/restore operations

  • US 4,464,724 A
  • Filed: 06/17/1981
  • Issued: 08/07/1984
  • Est. Priority Date: 06/17/1981
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for controlling delivery of electrical energy from a power line to an establishment having a plurality of electrical loads in order to maintain the total power delivered to the electrical loads close to a selected power limit, the electrical loads including a plurality of controlled loads which can be electrically connected to and disconnected from the power line in accordance with priorities of the controlled loads by means of a control system, the control system including a plurality of load switching means for controllably connecting the controlled loads to and disconnecting the controlled loads from the power line, the control system also including power measuring means for measuring power delivered from the power line to the electrical loads, said method comprising operating a processor to effect the steps of:

  • (a) computing and storing a power consumption number for any one of the controlled loads when that controlled load is electrically disconnected from the power line or is electrically connected to the power line;

    (b) computing a minor average that represents the average power consumption of the establishment during a first period of time prior to the present time;

    (c) computing a major average that represents the average power consumption of the establishment during a second period of time prior to the present time, said second period of time being substantially greater than said first period of time;

    (d) comparing said major average to said selected power limit, and comparing said minor average to said selected power limit;

    (e) electrically disconnecting the lowest priority controlled load presently electrically connected to the power line, if both said major average and said minor average are greater than said selected power limit;

    (f) repeating steps (b), (c), (d) and (e) until either said major average or said minor average is less than said selected power limit;

    (g) computing a first power availability number representative of the difference between the selected power limit and said major average;

    (h) comparing a stored power consumption number of a first highest-priority one of the controlled loads not presently electrically connected to the power line with said first power availability number and electrically connecting said first highest-priority controlled load to the power line if the power consumption of that controlled load is less than said first power availability number and both said major average and said minor average are less than said selected power limit; and

    (i) repeating steps (b), (c), (d), (g) and (h) until the highest priority remaining controlled load not presently electrically connected to the power line has a power consumption that is greater than the power availability number computed in step (g).

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×