×

High speed well surveying

  • US 4,468,863 A
  • Filed: 08/17/1981
  • Issued: 09/04/1984
  • Est. Priority Date: 08/17/1981
  • Status: Expired due to Term
First Claim
Patent Images

1. In a borehole survey method which employs first means for measuring angular rate, and second means for sensing tilt, said second means having at least two input axes of sensitivity, said first and second means having outputs, and a rotary drive for said first and second means, the steps that include(a) operating the drive and the first and second means at a first location in the borehole, and while travel of said means lengthwise in the borehole is arrested, to determine the azimuthal direction of tilt of the borehole at such location,(b) then traveling the first and second means and the drive lengthwise of the borehole away from the first location, and operating the drive and at least one of the first and second means during such traveling to determine changes in borehole alignment which occur during traveling,(c) said (b) step including operating the drive to adjust and maintain one of said input axes horizontal during said traveling,(d) said (b) step also including integrating the output of said first means to determine changes in borehole azimuth during said traveling.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×