×

Method of installing and using offshore well development and production platforms

  • US 4,492,270 A
  • Filed: 04/06/1981
  • Issued: 01/08/1985
  • Est. Priority Date: 05/02/1980
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for installing and using an offshore well development platform in water having a depth suitable for use of jack-up drilling platforms, the method comprising the steps of:

  • (a) providing a jack-up drilling platform having thereon;

    (1) a drilling rig having an operative position in a drilling operations area outboard of an elevatable base of the jack-up platform; and

    (2) a crane on the elevatable base adjacent the perimeter of the base and proximate the drilling rig operative position;

    (b) positioning the jack-up platform at an offshore location with the base thereof elevated above the water surface so that the drilling operations area is located vertically over a submerged location on the sea floor at which at least one subsea oil or gas well is to be drilled;

    (c) thereafter moving to the offshore location a prefabricated well protector jacket assembly having a length sufficient to extend from the submerged location to above the water surface thereabove, such length being insufficient to extend to the elevation of the drilling rig when the drilling rig is in its operative position;

    (d) thereafter setting the well protector jacket assembly in an erect attitude on the sea floor over the submerged location;

    (e) thereafter securing the sea jacket assembly to the sea floor over the submerged location by use at least in part, of the jack-up platform;

    (f) moving to the site of the secured jacket assembly a prefabricated development wellhead deck assembly matable with the upper end of the secured jacket assembly;

    (g) thereafter mating the wellhead deck assembly securely to the jacket assembly below the operative position of the drilling rig, thus to define independently of the jack-up platform a completed development wellhead platform above the water surface and below the operative position of the drilling rig;

    (h) thereafter using the drilling rig in its operative position to drill and complete through the wellhead platform at least one well into the sea floor;

    (i) at a desired time after performance of step (b) above, moving to the offshore location adjacent the jack-up platform a prefabricated production platform leg assembly having a length substantially equal to that of the well protector jacket assembly;

    (j) thereafter, at a desired time after performance of step (e) above, setting the leg assembly in an erect attitude on the sea floor adjacent the secured jacket assembly;

    (k) thereafter, securing the leg assembly to the sea floor by use, at least in part, of the jack-up platform;

    (l) thereafter, moving to the site of the secured leg assembly a completed prefabricated production platform deck assembly matable with the upper end of the secured leg assembly; and

    (m) thereafter, mating the production platform deck assembly securely to the production leg platform assembly to define a complete production platform.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×